POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 53items · current page 1–53 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Bolivar Waste Water Treatment Generator · Operations
Metric or condition Source value Basis, scope and stage Unit Capacity (MW AC) 2.52 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 Aggregated Nameplate Capacity (MW AC) 2.52 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 Agg Nameplate Storage Capacity (MWh) 5.04 MWh Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364
Detailed source fields Original source field Published value or condition Survey ID 1393 Site Name Bolivar Waste Water Treatment Site Owner South Australian Water Corporation Region SA1 Max Site Capacity (AC) 17.5 Gen Info Unit ID 139304 Unit Name BOWWBA1 Technology Type Battery Storage Technology Detail Lithium-ion DUID BOWWBA1 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 2.52 Aggregated Nameplate Capacity (MW AC) 2.52 Agg Nameplate Storage Capacity (MWh) 5.04 Commitment Status In Service Expected Closure Year 2045 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-03-11T12:37:01 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:151
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:72
Sources EV-c97d3f649fda13b6f448c57f Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 969603cfabbdda8da4cf2d0b18927d91dfbf4025ba37fd107bd35bae4bf05988 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 1393 Site Name Bolivar Waste Water Treatment Site Owner South Australian Water Corporation Region SA1 Max Site Capacity (AC) 17.5 Gen Info Unit ID 139304 Unit Name BOWWBA1 Technology Type Battery Storage Technology Detail Lithium-ion DUID BOWWBA1 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 2.52 Aggregated Nameplate Capacity (MW AC) 2.52 Agg Nameplate Storage Capacity (MWh) 5.04 Commitment Status In Service Expected Closure Year 2045 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-03-11T12:37:01 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:151
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region SA1 AEMO Survey ID 1393 Gen Info Unit ID 139304 Site Name Bolivar Waste Water Treatment DUID BOWWBA1 Commitment Status In Service Expected Closure Year 2045 Survey Latest Update Date 2026-03-11T12:37:01 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Expected Closure Year:72
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:72
Sources EV-c97d3f649fda13b6f448c57f Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 969603cfabbdda8da4cf2d0b18927d91dfbf4025ba37fd107bd35bae4bf05988 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2.2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 4.4 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2.2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 4.4 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 4 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 4.4 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2.2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 4.4 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 4.4 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 4.4 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2.2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 4 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 4.4 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 4 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 4.4 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 4 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2.2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 4.4 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2.2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 4 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 4 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 4 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 4 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2.2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2.2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2.1 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2.2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 4.4 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 4 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 2.2 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 4 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6b666e2304c32eba43099364 측정·전망기간 Summer 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:151
Sources EV-6b666e2304c32eba43099364 Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 f0e363e354fc74369de06d6e85d17aba8e3c3db8fbc81c25dc24b5fe02a158a4 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset