KOREA DATA CENTER DATABASE

Explore Korean data center locations and status.

Search by region, operator, and project stage, and switch between the list and map to check facility specifications and sources. Be sure to review the scope and timing of the publicly available data.

Registered Business Sites101Includes operating and developing sites
Operating centers68Includes operation and expansion plans
Map Display85Address and area-level locations distinguished
Operating and Development Entities31Names linked to public centers

Latest facility record check 2026-10-19 · The verification date for each individual record is indicated in the details. The number of registered entries does not represent the total market size nationwide.

Looking for a center that meets your needs?

Tell us your preferred location, power requirement and timing so we can outline the facility conditions to check.

You can submit an initial inquiry without signing up.

Saved regions and filters

Save up to 20 region, operator and project-stage filters to revisit current listings.

Loading saved filters…

Reopen current listings with saved filters. No email alerts are sent.

Official specification evidence 93records · latest check 2026-10-14. The listing of specifications does not imply verification of remaining capacity or the validity of certifications.

Centers by operator · 31entities
Current Search Results: Project Stage and Regional Distribution
Search Results · Operation and Development Stages

These are registered sites that match your current search criteria.

  • Operations1 items
Search Results · Regional Distribution

This is distinct from overall market share nationwide.

  • Mapo, Seoul1 items

Search Results 1Location · 1–1 shown

Compare centers 0/3Comparison and full CSV require Research Pro.
Compare selected centers →
Mapo, SeoulOperations

Digital Realty Seoul ICN10

Digital Realty

12 World Cup Buk-ro 60-gil, Mapo-gu, Seoul

상암 DMC에서 2022년 운영을 시작한 Digital Realty의 국내 첫 데이터센터입니다. 통신사 중립 코로케이션과 연결 인프라를 제공하며, 최대 IT 용량 12MW를 공식 발표했습니다.

Public Power
Maximum IT capacity: 12 MW
Size & facility
Total building 15,200 m² · Colocation area requires verification
  • Utility feed voltage22.9 kVDesign value · Digital Realty
  • Total building area15200 m²Operator-disclosed specifications · Digital Realty
Official Cross-VerificationFacility record checked 2026-10-19Specification evidence 10records · checked 2026-10-07

Find a center and continue your review.

Please verify the facility’s publicly disclosed specifications and actual occupancy and supply conditions separately.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel