KOREA DATA CENTER DATABASE
Explore Korean data center locations and status.
Search by region, operator, and project stage, and switch between the list and map to check facility specifications and sources. Be sure to review the scope and timing of the publicly available data.
Latest facility record check 2026-10-19 · The verification date for each individual record is indicated in the details. The number of registered entries does not represent the total market size nationwide.
Looking for a center that meets your needs?
Tell us your preferred location, power requirement and timing so we can outline the facility conditions to check.
You can submit an initial inquiry without signing up.Saved regions and filters
Save up to 20 region, operator and project-stage filters to revisit current listings.
Loading saved filters…
Reopen current listings with saved filters. No email alerts are sent.
Official specification evidence 93records · latest check 2026-10-14. The listing of specifications does not imply verification of remaining capacity or the validity of certifications.
Centers by operator · 31entities
Current Search Results: Project Stage and Regional Distribution
These are registered sites that match your current search criteria.
This is distinct from overall market share nationwide.
Reference locations for each region are indicated by dotted borders. Centers with unconfirmed locations are also included in the list below.
LG Uplus Busan Ami Center
14 Daecheong-ro 6-gil, Seo-gu, Busan · Verification Coordinates
Chuncheon Water-Heat Energy Shinsegae Consortium AI Data Center
Shinsegae Group·SSG AI DC (business operator to be confirmed)
Water-Heat Energy Convergence Cluster, Jinae-ri, Dong-myeon, Chuncheon-si, Gangwon Special Self-Governing Province (specific lots to be determined)
춘천 수열에너지 신세계 협의 AI 데이터센터는 소양강댐 하류 수열에너지 융복합클러스터에서 신세계가 검토 중인 투자 후보입니다. 2026년 9월 강원도지사 기자간담회에서 투자검토·협의 사실이 공개됐으며 최종 확정 전이라고 설명됐습니다.
- Public Power
- Individual power intake capacity, UPS, IT load, PUE, and power contracts are not disclosed.
- Size & facility
- Of the 815,000 m² cluster, the site and building sizes for individual data centers have not yet been determined.
Kakao Data Center in Ansan
Kakao
55 Hanyang University-ro, Sangnok-gu, Ansan-si, Gyeonggi-do
카카오의 첫 자체 데이터센터로, 한양대학교 ERICA 캠퍼스 안에 2023년 9월 준공하고 2024년 1월 가동했습니다. 연면적 47,378㎡, 4,000랙·서버 12만 대 수용·6EB 저장 규모로 소개되며 카카오 서비스 연속성을 위한 전력·통신·냉각 다중화가 핵심입니다.
- Public Power
- Undisclosed or planned PUE of 1.3 or lower
- Size & facility
- Total floor area: 47,378 m²; 120,000 servers
Pohang Gwangmyeong Industrial Complex AI Data Center
NHN Cloud (operational after completion) · NeoAI Cloud/PFV (development and procurement)
경상북도 포항시 남구 오천읍 광명일반산업단지(세부 필지 미공개)
포항 광명일반산업단지에 네오에이아이클라우드가 시행하고 에이아이팩토리포항PFV가 발주한 AI 전용 데이터센터입니다. 현대건설이 2026년 9월 본계약과 PC 구조체 설치 착수를 발표했으며, 차세대 GPU와 수랭식 고밀도 인프라를 수용하도록 건설 중입니다.
- Public Power
- Power Capacity: 40 MW · IT Load: 32 MW · Design PUE: 1.25 · UPS: Not Disclosed
- Size & facility
- Phase 1: 40 MW power intake capacity, 32 MW IT load; separate expansion plan for Phase 2: 260 MW
Hanam Pungsan-dong Edge Data Center
Operator verification in progress
경기도 하남시 풍산동 595
경기 하남시 풍산동 595의 기존 건물을 데이터센터로 리모델링하는 엣지 데이터센터 사업입니다. 하남시의 2026년 안전점검 수행기관 지정공고에 사업주체·설계자·시공사와 건물 규모가 기재돼 있습니다.
- Public Power
- Undisclosed
- Size & facility
- 대지 2,946.7㎡·연면적 20,402.37㎡·지하 3층/지상 8층
Alibaba Cloud Korea Data Center 1
Alibaba Cloud
Republic of Korea (official detailed address not disclosed)
2022년 3월 출범한 Alibaba Cloud의 한국 첫 데이터센터입니다. 국내 기업의 디지털 전환과 해외 사업 확장을 위한 퍼블릭 클라우드 인프라로, 일반 기업의 자체 서버를 들여놓는 코로케이션 시설과 이용 방식이 다릅니다.
- Public Power
- Power Capacity, UPS, IT Load, and PUE are not disclosed.
- Size & facility
- Verify the official network of data centers operated by the operator; physical specifications are not disclosed.
Alibaba Cloud Korea Data Center 2
Alibaba Cloud
Republic of Korea (official detailed address not disclosed)
Alibaba Cloud가 2025년 국내 클라우드·AI 수요 증가에 대응해 확장한 한국 두 번째 데이터센터입니다. 첫 센터 이후 클라우드 복원력과 네트워크 성능을 강화하는 현지 인프라 확장으로 소개됐습니다.
- Public Power
- Power Capacity, UPS, IT Load, and PUE are not disclosed.
- Size & facility
- Verify the official network of data centers operated by the operator; physical specifications are not disclosed.
Alibaba Cloud Korea Data Center 3
Alibaba Cloud
Republic of Korea (official detailed address not disclosed)
2026년 8월 18일 출범을 발표한 Alibaba Cloud의 한국 세 번째 데이터센터입니다. 기업의 AI 도입과 핵심 클라우드 워크로드 확대에 대응하는 국내 인프라 증설로 소개됐습니다.
- Public Power
- Power Capacity, UPS, IT Load, and PUE are not disclosed.
- Size & facility
- Verify the official network of data centers operated by the operator; physical specifications are not disclosed.
Digital Edge PUS1
Digital Edge
32 Centum 7-ro, Haeundae-gu, Busan, South Korea
부산 센텀시티의 국제 연결 거점으로 해저케이블 육양국 통합을 특징으로 소개하는 통신사 중립 데이터센터입니다. 수도권과 떨어진 지역 분산과 국제 트래픽 연결을 함께 검토할 수 있습니다.
- Public Power
- Official page: 4.5 MW (marked as “planned update”—need to verify current status)
- Size & facility
- Colocation: 9,463 m² · 1,605 cabinets
- 운영사 계획 갱신 용량4.5 MWTarget value · Digital Edge
Digital Edge SEL1
Digital Edge
646-1 Yeoksam-dong, Gangnam-gu, Seoul
서울 강남 역삼 업무권의 통신사 중립 데이터센터입니다. 다크파이버 접근성과 네트워크 밀집도를 바탕으로 저지연 애플리케이션과 기업 연결 인프라를 지원합니다.
- Public Power
- Discrepancy between 4.8 MW on the official page and 2.4 MW in the detailed table
- Size & facility
- 1,055 cabinets · 3,331 m² of colocation space
- 운영사 표기 용량2.4 MWOperator-disclosed specifications · Digital Edge
Digital Edge SEL2
Digital Edge
422 Cheongcheon-dong, Bupyeong-gu, Incheon, South Korea
인천 부평 캠퍼스의 운영 중인 1단계 센터로, Digital Edge와 SK에코플랜트가 개발한 36MW 규모의 AI-ready 시설입니다. 기존 강남·부산의 연결 중심 시설에 대규모 고전력 수용 역량을 더하는 거점입니다.
- Public Power
- IT capacity: 36 MW
- Size & facility
- Bupyeong Campus Phase 1
- RFS 도달 시 points2024-08 date_monthOperator-disclosed specifications · Digital Edge
- 운영사 표기 용량36 MWOperator-disclosed specifications · Digital Edge
Digital Edge SEL3
Digital Edge
Bupyeong-gu, Incheon Metropolitan City (same campus adjacent to SEL2)
인천 부평의 SEL2 인접 부지에 건설하는 Digital Edge의 2단계 데이터센터입니다. 하이퍼스케일과 기업 고객의 고밀도·확장 수요를 위한 60MW 규모를 계획합니다.
- Public Power
- Planned IT capacity: 60 MW
- Size & facility
- Bupyeong Campus Phase 2 and SEL2: Total 96 MW
- 부평 캠퍼스 전체 계획 규모96 MWTarget value · Digital Edge
- 착공 시 points2025-05 date_monthOperator-disclosed specifications · Digital Edge
Digital Edge SEL5
Digital Edge
Siheung National Industrial Complex, Ansan City, Gyeonggi Province (official detailed address not disclosed)
경기 안산 시화국가산업단지에서 추진하는 Digital Edge의 신규 AI-ready 데이터센터입니다. 2026년 6월 부지 확보와 90MVA 전력계약을 발표했으며 60MW 시설 개발을 계획합니다.
- Public Power
- 90 MVA Power Contract/Plan; IT Load: 60 MW
- Size & facility
- New Physical Site in Ansan
- 신규 센터 계획 규모60 MWTarget value · Digital Edge
- 전력계약 발표 용량90 MVAOperator-disclosed specifications · Digital Edge
Digital Realty Gimpo ICN11
Digital Realty
6877-9 Gurae-dong, Gimpo-si, Gyeonggi-do
김포 구래동에 조성하는 Digital Realty의 국내 확장 데이터센터 사업입니다. 서울 상암 ICN10과 다른 물리 사업지이며, 공개 공사자료는 Digital Seoul 2 Ltd. 발주·DL이앤씨 시공의 IT Load 64MW 규모로 설명합니다.
- Public Power
- Planned IT Load: 64 MW
- Size & facility
- 4 basement levels and 8 above-ground levels
Digital Realty Seoul ICN10
Digital Realty
12 World Cup Buk-ro 60-gil, Mapo-gu, Seoul
상암 DMC에서 2022년 운영을 시작한 Digital Realty의 국내 첫 데이터센터입니다. 통신사 중립 코로케이션과 연결 인프라를 제공하며, 최대 IT 용량 12MW를 공식 발표했습니다.
- Public Power
- Maximum IT capacity: 12 MW
- Size & facility
- Total building 15,200 m² · Colocation area requires verification
- Utility feed voltage22.9 kVDesign value · Digital Realty
- Total building area15200 m²Operator-disclosed specifications · Digital Realty
Empyrion KR1 Gangnam
Empyrion Digital
224 Yangjae-dong, Seocho-gu, Seoul
서울 서초구 양재동에 위치한 Empyrion Digital의 통신사 중립 데이터센터입니다. 강남 업무·기술 기업 수요를 겨냥해 기업 코로케이션과 AI·GPU 서버 수용을 함께 소개합니다.
- Public Power
- IT capacity: 29.4 MW
- Size & facility
- Colocation: 30,714 square meters
- IT capacity29.4 MWOperator-disclosed specifications · Empyrion Digital
- Cooling technologyStatePoint Liquid Cooling technologyOperator-disclosed specifications · Empyrion Digital
Equinix Seoul SL1
Equinix
3rd Floor, Samsung SDS Sangam IT Center, 24 World Cup Buk-ro 60-gil, Mapo-gu, Seoul
서울 상암 삼성SDS 상암IT센터 3층에 위치한 Equinix IBX 코로케이션 센터입니다. 고객 서버를 안전한 공간에 두고 통신사·인터넷 교환·클라우드 연결을 조합하는 기업 인프라 거점입니다.
- Public Power
- Undisclosed
- Size & facility
- Colocation 3,082 m²
- Minimum cabinet power density5 kVA/cabinetOperator-disclosed specifications · Equinix
- Colocation area3082 m²Operator-disclosed specifications · Equinix
Equinix Seoul SL2x·SL4
Equinix
69 Hyangdong-ro, Deogyang-gu, Goyang, South Korea
고양 향동 캠퍼스의 Equinix xScale 시설로 대규모 하이퍼스케일 고객을 위한 전용 인프라를 제공합니다. 같은 건물·캠퍼스 안의 IBX SL4와는 상품과 이용구역을 구분해 볼 수 있습니다.
- Public Power
- 22MW
- Size & facility
- SL2x 5,503㎡·SL4 1,129㎡
- Colocation area5503 m²Operator-disclosed specifications · Equinix
- Cooling technologyFree cooling; hot/cold aisle containment technologyOperator-disclosed specifications · Equinix
Equinix SL4
Equinix
69 Hyangdong-ro, Deogyang-gu, Goyang, South Korea
Equinix의 두 번째 서울 IBX로, 고양 향동의 xScale SL2x 내부에서 기업 고객에게 코로케이션과 상호연결 서비스를 제공합니다. 상암 SL1과 고양 하이퍼스케일 캠퍼스를 연결하는 기업 인프라 이용 지점입니다.
- Public Power
- Undisclosed
- Size & facility
- Additional verification of disclosed capacity
- Minimum cabinet power density5 kVA/cabinetOperator-disclosed specifications · Equinix
- Colocation area1129 m²Operator-disclosed specifications · Equinix
GS AI Infrastructure Donghae AI Data Center Campus
GS AI Infrastructure
Bukpyeong 2nd General Industrial Complex, Donghae City, Gangwon Special Self-Governing Province (exact lot number unconfirmed)
GS 동해 AI 데이터센터 캠퍼스는 동해시 북평제2일반산업단지에 계획된 AI 인프라 개발사업입니다. 동해시에 따르면 ㈜동해에이아이제3캠퍼스가 신청한 첫 100MW급 데이터센터의 건축허가가 2026년 10월 1일 처리됐습니다.
- Public Power
- 100MW·1.2GW·2.4GW는 정의 미공개 계획 규모·전력계통영향평가 절차 확인·전기사용계약/계통접속/수전 개시 미확인
- Size & facility
- 첫 동 부지 약 68,000㎡·연면적 약 35,000㎡·지상 2층·100MW급, 1단계 1.2GW·장기 총 2.4GW 계획
JDC Jeju Green AI Data Center
Jeju International Free City Development Center (JDC)
Jeju High-Tech Science and Technology Complex Phase 2 (Candidate area and lot not yet determined)
제주 그린 AI 데이터센터는 제주도의 AI 전환과 공공데이터·지역산업 서비스를 지원하기 위해 검토하는 재생에너지 연계 인프라 구상입니다. 2026년 8월 JDC 이사장은 제주도·제주테크노파크 등과 기획용역을 진행하고 제2첨단과학기술단지를 후보 권역으로 검토한다고 설명했습니다.
- Public Power
- 계획 수전용량 40MW(2026-09-15 제주도 발표)·재생에너지/전력·연산 연계 기획·전기사용계약·계통접속 승인 미확인
- Size & facility
- 제주도 2026년 9월 발표상 수전 기준 40MW 구상·건물 규모·IT Load·UPS 미공개
KINX Gwacheon Data Center
KINX
34 Gwacheon-daero 7-na-gil, Gwacheon-si, Gyeonggi-do
KINX의 IX·클라우드 연결·코로케이션을 한곳에서 활용하는 과천 네트워크 플랫폼 센터입니다. 고객 장비와 국내외 통신사, 클라우드 사업자를 연결하는 중립 인프라를 중심으로 AI와 기업 IT 수요를 지원합니다.
- Public Power
- IT Load 10MW
- Size & facility
- Site area: 22,000 ㎡; IT capacity: 10 MW
- Design PUE1.3Design value · KINX
- 이중화 구성 가용성 조건99.999 percentTarget value · KINX
KINX Dogok Center 1
KINX
13 Eonju-ro 30-gil, Gangnam-gu, Seoul
강남 도곡의 네트워크 밀집 거점으로 해외 ISP·콘텐츠 사업자의 PoP 수요를 지원하는 KINX 메인 센터입니다. 백본과 상주 관제를 함께 제공합니다.
- Public Power
- Undisclosed
- Size & facility
- Urban Colocation
KINX Bundang Center 3
KINX
36 Jangmi-ro, Bundang-gu, Seongnam-si, Gyeonggi-do
장미로 호스트웨이 IDC 내 KINX 거점으로, 현행 운영사 안내에서는 분당1(BD1)로 소개됩니다. 전용 데이터센터 건물에서 고밀도 랙 수요에 대응합니다.
- Public Power
- Undisclosed
- Size & facility
- Operated within Hostway IDC
KINX Pyeongchon Center
KINX
경기도 안양시 동안구 시민대로327번길 29 LG U+ 평촌센터
LG U+ 평촌센터 내 KINX 코로케이션 거점입니다. 안양권에서 전원관리와 고밀도 서버 수용을 중심으로 운영사가 소개하는 시설입니다.
- Public Power
- Undisclosed
- Size & facility
- Currently verifying the official network of data centers operated by the provider and conducting further verification of detailed specifications.
Find a center and continue your review.
Please verify the facility’s publicly disclosed specifications and actual occupancy and supply conditions separately.
