KOREA DATA CENTER DATABASE
Explore Korean data center locations and status.
Search by region, operator, and project stage, and switch between the list and map to check facility specifications and sources. Be sure to review the scope and timing of the publicly available data.
Latest facility record check 2026-10-29 · The verification date for each individual record is indicated in the details. The number of registered entries does not represent the total market size nationwide.
Looking for a center that meets your needs?
Tell us your preferred location, power requirement and timing so we can outline the facility conditions to check.
You can submit an initial inquiry without signing up.Saved regions and filters
Save up to 20 region, operator and project-stage filters to revisit current listings.
Loading saved filters…
Reopen current listings with saved filters. No email alerts are sent.
Official specification evidence 93records · latest check 2026-10-14. The listing of specifications does not imply verification of remaining capacity or the validity of certifications.
Centers by operator · 57entities
Current Search Results: Project Stage and Regional Distribution
These are registered sites that match your current search criteria.
This is distinct from overall market share nationwide.
Reference locations for each region are indicated by dotted borders. Centers with unconfirmed locations are also included in the list below.
kt cloud 안산 AI 데이터센터
경기도 안산시 반월국가산업단지(정확한 필지 미공개) · Area reference — not facility location
코스콤 부산 Proximity DC
코스콤
부산광역시 동구 자성로133번길15 KB손해보험빌딩2층
- Public Power
- 공개 전력 미확보
- Size & facility
- 공개 규모 미확보
코스콤 안양센터
코스콤
경기도 안양시 동안구 엘에스로115번길26
- Public Power
- 공개 전력 미확보
- Size & facility
- 공개 규모 미확보
코스콤/거래소 여의도 전산센터
코스콤·한국거래소
서울특별시 영등포구 여의나루로76
- Public Power
- 공개 전력 미확보
- Size & facility
- 공개 규모 미확보
Pohang Gwangmyeong Industrial Complex AI Data Center
NHN Cloud (operational after completion) · NeoAI Cloud/PFV (development and procurement)
경상북도 포항시 남구 오천읍 광명일반산업단지(세부 필지 미공개)
포항 광명일반산업단지에 네오에이아이클라우드가 시행하고 에이아이팩토리포항PFV가 발주한 AI 전용 데이터센터입니다. 현대건설이 2026년 9월 본계약과 PC 구조체 설치 착수를 발표했으며, 차세대 GPU와 수랭식 고밀도 인프라를 수용하도록 건설 중입니다.
- Public Power
- Power Capacity: 40 MW · IT Load: 32 MW · Design PUE: 1.25 · UPS: Not Disclosed
- Size & facility
- Phase 1: 40 MW power intake capacity, 32 MW IT load; separate expansion plan for Phase 2: 260 MW
하나금융그룹 통합데이터센터
하나금융TI
인천광역시 서해구 에코로167 (기존 서구 청라동)
- Public Power
- UPS: UPS 설치 · 비상발전: 비상발전 설비 설치
- Size & facility
- 연면적·건물: 약66,000㎡
Hanam Pungsan-dong Edge Data Center
Operator verification in progress
경기도 하남시 풍산동 595
경기 하남시 풍산동 595의 기존 건물을 데이터센터로 리모델링하는 엣지 데이터센터 사업입니다. 하남시의 2026년 안전점검 수행기관 지정공고에 사업주체·설계자·시공사와 건물 규모가 기재돼 있습니다.
- Public Power
- Undisclosed
- Size & facility
- 대지 2,946.7㎡·연면적 20,402.37㎡·지하 3층/지상 8층
한국지역정보개발원 상암 주센터
KLID
서울특별시 마포구 성암로301
- Public Power
- 공개 전력 미확보
- Size & facility
- 공개 규모 미확보
한화 통합 데이터센터
한화시스템
경기도 용인시 수지구 디지털벨리로101
- Public Power
- 공개 전력 미확보
- Size & facility
- 연면적·건물: 공시상4,785㎡. 설계/시공사 자료의 전체 건물면적과 범위가 다를 수 있음
현대오토에버 광주 데이터센터
현대오토에버
광주광역시 광산구 진곡산단중앙로75
- Public Power
- 수전·시설전력: 10MW(2022 저널의 규모 표현; 수전·IT 지표 정의 미표기)
- Size & facility
- 공개 규모 미확보
현대오토에버 의왕 데이터센터
현대오토에버
경기도 의왕시 철도박물관로37
- Public Power
- 수전·시설전력: 6MW(2022 저널의 규모 표현; 수전·IT 지표 정의 미표기)
- Size & facility
- 공개 규모 미확보
현대오토에버 파주 데이터센터
현대오토에버
경기도 파주시 조리읍 팔학골길148-43
- Public Power
- 수전·시설전력: 14MW(2022 저널의 규모 표현; 수전·IT 지표 정의 미표기)
- Size & facility
- 공개 규모 미확보
호스트웨이 분당 IDC (원장: KINX 분당3)
KINX
36 Jangmi-ro, Bundang-gu, Seongnam-si, Gyeonggi-do
장미로 호스트웨이 IDC 내 KINX 거점으로, 현행 운영사 안내에서는 분당1(BD1)로 소개됩니다. 전용 데이터센터 건물에서 고밀도 랙 수요에 대응합니다.
- Public Power
- UPS: Dynamic·Static UPS·필요설비수+1개 이상 예비 · 비상발전: 외부지원 없이 최소12시간 자체발전 (총 정격용량 미확보)
- Size & facility
- 연면적·건물: 4,500평(원문 단위)
Alibaba Cloud Korea Data Center 1
Alibaba Cloud
Republic of Korea (official detailed address not disclosed)
2022년 3월 출범한 Alibaba Cloud의 한국 첫 데이터센터입니다. 국내 기업의 디지털 전환과 해외 사업 확장을 위한 퍼블릭 클라우드 인프라로, 일반 기업의 자체 서버를 들여놓는 코로케이션 시설과 이용 방식이 다릅니다.
- Public Power
- Power Capacity, UPS, IT Load, and PUE are not disclosed.
- Size & facility
- Verify the official network of data centers operated by the operator; physical specifications are not disclosed.
Alibaba Cloud Korea Data Center 2
Alibaba Cloud
Republic of Korea (official detailed address not disclosed)
Alibaba Cloud가 2025년 국내 클라우드·AI 수요 증가에 대응해 확장한 한국 두 번째 데이터센터입니다. 첫 센터 이후 클라우드 복원력과 네트워크 성능을 강화하는 현지 인프라 확장으로 소개됐습니다.
- Public Power
- Power Capacity, UPS, IT Load, and PUE are not disclosed.
- Size & facility
- Verify the official network of data centers operated by the operator; physical specifications are not disclosed.
Alibaba Cloud Korea Data Center 3
Alibaba Cloud
Republic of Korea (official detailed address not disclosed)
2026년 8월 18일 출범을 발표한 Alibaba Cloud의 한국 세 번째 데이터센터입니다. 기업의 AI 도입과 핵심 클라우드 워크로드 확대에 대응하는 국내 인프라 증설로 소개됐습니다.
- Public Power
- Power Capacity, UPS, IT Load, and PUE are not disclosed.
- Size & facility
- Verify the official network of data centers operated by the operator; physical specifications are not disclosed.
BNK금융그룹 IT센터
line BNK부산은
부산광역시 강서구 미음산단로127번길21 (구랑동1168-4)
- Public Power
- 공개 전력 미확보
- Size & facility
- 대지: site_area: 18108 ㎡ (전산동·개발동 전체) · 연면적·건물: gross_floor_area: 44260 ㎡ (전산동·개발동 전체) / gross_floor_area: 18288 ㎡ (정림씨엠 수록 프로젝트·지하1층 지상5층) / gross_floor_area: 44237 ㎡ (간삼 설계 프로젝트)
CJ 송도 IDC
CJ올리브네트웍스
인천광역시 연수구 하모니로177번길20
- Public Power
- 공개 전력 미확보
- Size & facility
- 연면적·건물: 3,589평 · 전산실·코로케이션: 2,884㎡(872평)
DB그룹 죽전 데이터센터
DB Inc.·DB손해보험
경기도 용인시 수지구 디지털벨리로61
- Public Power
- 공개 전력 미확보
- Size & facility
- 대지: 4,851㎡ · 연면적·건물: 18,513㎡ · 전산실·코로케이션: 3,894㎡·5개층
Digital Edge PUS1
Digital Edge
32 Centum 7-ro, Haeundae-gu, Busan, South Korea
부산 센텀시티의 국제 연결 거점으로 해저케이블 육양국 통합을 특징으로 소개하는 통신사 중립 데이터센터입니다. 수도권과 떨어진 지역 분산과 국제 트래픽 연결을 함께 검토할 수 있습니다.
- Public Power
- 수전·시설전력: 4.5MW(planned update) · UPS: N+1 Static UPS · 비상발전: N+1, 1,000kVA×2 가스터빈 / 백업24시간 안내
- Size & facility
- 연면적·건물: 코로케이션 9,463㎡·1,605 cabinets · 전산실·코로케이션: 9,463㎡
- 운영사 계획 갱신 용량4.5 MWTarget value · Digital Edge
Digital Edge SEL1
Digital Edge
646-1 Yeoksam-dong, Gangnam-gu, Seoul
서울 강남 역삼 업무권의 통신사 중립 데이터센터입니다. 다크파이버 접근성과 네트워크 밀집도를 바탕으로 저지연 애플리케이션과 기업 연결 인프라를 지원합니다.
- Public Power
- 수전·시설전력: 2.4MW(현행 페이지 본문 및 Capacity 항목) · UPS: N+1 Dynamic UPS · 비상발전: N, 1,500kW 디젤 /24시간 안내
- Size & facility
- 연면적·건물: 1,055 cabinets·코로케이션 3,331㎡ · 전산실·코로케이션: 3,331㎡
- 운영사 표기 용량2.4 MWOperator-disclosed specifications · Digital Edge
Digital Edge SEL2
Digital Edge
422 Cheongcheon-dong, Bupyeong-gu, Incheon, South Korea
인천 부평 캠퍼스의 운영 중인 1단계 센터로, Digital Edge와 SK에코플랜트가 개발한 36MW 규모의 AI-ready 시설입니다. 기존 강남·부산의 연결 중심 시설에 대규모 고전력 수용 역량을 더하는 거점입니다.
- Public Power
- 수전·시설전력: SEL2 36MW(96MW는 SEL2+SEL3 캠퍼스 합계) · UPS: N+1 SUPS · 비상발전: N+1 catcher /3.25MW×11 및3MW×10 표기: 설치범위·단계별 구성 확인
- Size & facility
- 연면적·건물: 부평 캠퍼스 1단계 RFS 도달 시점 2024-08 date_month · 전산실·코로케이션: 10,966㎡
- RFS 도달 시 points2024-08 date_monthOperator-disclosed specifications · Digital Edge
- 운영사 표기 용량36 MWOperator-disclosed specifications · Digital Edge
Digital Edge SEL3
Digital Edge
Bupyeong-gu, Incheon Metropolitan City (same campus adjacent to SEL2)
인천 부평의 SEL2 인접 부지에 건설하는 Digital Edge의 2단계 데이터센터입니다. 하이퍼스케일과 기업 고객의 고밀도·확장 수요를 위한 60MW 규모를 계획합니다.
- Public Power
- Planned IT capacity: 60 MW
- Size & facility
- Bupyeong Campus Phase 2 and SEL2: Total 96 MW
- 부평 캠퍼스 전체 계획 규모96 MWTarget value · Digital Edge
- 착공 시 points2025-05 date_monthOperator-disclosed specifications · Digital Edge
Digital Edge SEL5
Digital Edge
Siheung National Industrial Complex, Ansan City, Gyeonggi Province (official detailed address not disclosed)
경기 안산 시화국가산업단지에서 추진하는 Digital Edge의 신규 AI-ready 데이터센터입니다. 2026년 6월 부지 확보와 90MVA 전력계약을 발표했으며 60MW 시설 개발을 계획합니다.
- Public Power
- 90 MVA Power Contract/Plan; IT Load: 60 MW
- Size & facility
- New Physical Site in Ansan
- 신규 센터 계획 규모60 MWTarget value · Digital Edge
- 전력계약 발표 용량90 MVAOperator-disclosed specifications · Digital Edge
Digital Realty Gimpo ICN11
Digital Realty
6877-9 Gurae-dong, Gimpo-si, Gyeonggi-do
김포 구래동에 조성하는 Digital Realty의 국내 확장 데이터센터 사업입니다. 서울 상암 ICN10과 다른 물리 사업지이며, 공개 공사자료는 Digital Seoul 2 Ltd. 발주·DL이앤씨 시공의 IT Load 64MW 규모로 설명합니다.
- Public Power
- Planned IT Load: 64 MW
- Size & facility
- 4 basement levels and 8 above-ground levels
Find a center and continue your review.
Please verify the facility’s publicly disclosed specifications and actual occupancy and supply conditions separately.
