Project statusUnder construction319-19 Gasan-dong, Geumcheon-gu, Seoul
- Region
- Geumcheon, Seoul
- Operator / developer
- Koramco Asset Management
- Public Power
- Undisclosed
- Size & facility
- 대지 6,141㎡·연면적 41,214.54㎡·지하 3층/지상 11층
Address-based location · Facility record checked 2026-10-19
Project statusInvestment Agreements and Plans전남광주통합특별시 강진군
- Region
- 전남 강진
- Operator / developer
- 베네포스 등 컨소시엄(개발협약 참여)
- Public Power
- 협약상: 사업규모 300MW · 수전·IT·전력계약 기준 미공 items
- Size & facility
- 강진 개별사업 300MW 계획
Awaiting coordinate verification · Facility record checked 2026-11-21
Project statusUnder construction166-2 Gaebong-dong, Guro-gu, Seoul
- Region
- Guro, Seoul
- Operator / developer
- Operator verification in progress
- Public Power
- Undisclosed
- Size & facility
- CM사 공개 연면적 19,255.39㎡·지하 4층/지상 8층(기존 행정원장 20,665㎡ 별도)
Address-based location · Facility record checked 2026-10-19
Project statusBuilding permit under review경기도 고양시 일산동구 식사동 293 외 19필지
- Region
- Goyang, Gyeonggi Province
- Operator / developer
- 사업법인·운영사 확인 중
- Public Power
- 수전·IT·계약전력 미확인
- Size & facility
- 공개 규모 미확인
Awaiting coordinate verification · Facility record checked 2026-11-21
인천광역시 연수구 벤처로14
- Region
- Incheon Metropolitan City
- Operator / developer
- 교보DTS
- Public Power
- 수전·시설전력: power_input: 10000 kW (송도 교보데이터센터)
- Size & facility
- 연면적·건물: 10985 ㎡ (송도 교보데이터센터)
Address-based location · Facility record checked 2026-10-29
충청북도 청주시 청원구 오창읍 중심상업2로72
- Region
- North Chungcheong Province
- Operator / developer
- Korea Meteorological Administration
- Public Power
- 수전·시설전력: power_input: 14000 kW (국가기상슈퍼컴퓨터센터 공개 설비표) · IT Load: 5호기 소비전력6,354kW (시설 정격 IT Load와 구분) · UPS: ups_capacity: 13500 kVA (국가기상슈퍼컴퓨터센터 공개 설비표) · 비상발전: backup_power: 10750 kW (국가기상슈퍼컴퓨터센터 공개 설비표)
- Size & facility
- 대지: 23,092㎡ · 연면적·건물: 8,465.8㎡ · 전산실·코로케이션: 5호기 상면780㎡ (센터 전체 상면 아님)
Address-based location · Facility record checked 2026-10-29
충청남도 공주시 사곡면 연수단지길 200
- Region
- 충남 공주
- Operator / developer
- 국가정보자원관리원
- Public Power
- 수전·IT 전력 미확인
- Size & facility
- Unverified
Awaiting coordinate verification · Facility record checked 2026-11-20
전남광주통합특별시 서구 송암로143번길 34
- Region
- Gwangju Metropolitan City
- Operator / developer
- 행정안전부 NIRS
- Public Power
- Published power figure unavailable
- Size & facility
- 연면적·건물: 34,000㎡
Awaiting coordinate verification · Facility record checked 2026-11-20
대구광역시 동구 도장길55-25
- Region
- Daegu Metropolitan City
- Operator / developer
- 행정안전부 NIRS
- Public Power
- Published power figure unavailable
- Size & facility
- 대지: 80,548㎡ · 연면적·건물: 35,675㎡
Address-based location · Facility record checked 2026-10-29
대전광역시 유성구 대덕대로755
- Region
- Daejeon Metropolitan City
- Operator / developer
- 행정안전부 NIRS
- Public Power
- Published power figure unavailable
- Size & facility
- 연면적·건물: 61,880㎡
Address-based location · Facility record checked 2026-10-29
Project statusInvestment Agreements and Plans경기도 군포시 군포역세권 복합개발지구
- Region
- 경기 군포
- Operator / developer
- SK에코플랜트·SK디앤디(개발협약)
- Public Power
- 수전·IT: 부하·전력계약 용량 미공 items
- Size & facility
- 개별: 사업부지·건축규모 미공 items
Awaiting coordinate verification · Facility record checked 2026-11-21
부산광역시 기장군 장안읍 오리 1144 외 7필지, 금양 기장공장
- Region
- Busan Area
- Operator / developer
- 금양·케이와이디씨(KYDC, 분할신설 예정)
- Public Power
- 154kV 변전소·100MW급 변압기 3대 이전 계획·DC 수전용량/IT Load/UPS/PUE 미확인
- Size & facility
- 기장공장 토지·건축물과 전력·냉각·용수·공조·통신·보안 기반시설 전환 계획
Awaiting coordinate verification · Facility record checked 2026-11-20
824 Haengbok-daero, Sejong, South Korea
- Region
- Jiphyeon-dong, Sejong
- Operator / developer
- Naver
- Public Power
- 수전·시설전력: 최대 수전용량 270MW 설계
- Size & facility
- 대지: 9만평 부지(운영사 원문 단위)
- Cooling technologyNAMU3 직접 외기·간접 외기 선택 하이브리드 공조Operator-disclosed specifications
- 본격 가동 시 pointsFull-scale operation begins in November 2023Operator-disclosed specifications
Address-based location · Facility record checked 2026-10-29Specification records: 4 · Checked 2026-10-19
강원특별자치도 춘천시 동면 순환대로 1231
- Region
- Chuncheon, Gangwon Province
- Operator / developer
- Naver
- Public Power
- 수전·시설전력: 각 세종의 1/6.75 수준으로 공식 비교·절대값 별도 확인
- Size & facility
- 연면적·건물: 연면적 약 46,850㎡
Awaiting coordinate verification · Facility record checked 2026-11-20
서울특별시 마포구 독막로 311 재화스퀘어 3층
- Region
- Seoul Special City
- Operator / developer
- 다우기술
- Public Power
- UPS: N+1 UPS
- Size & facility
- Published area figure unavailable
Address-based location · Facility record checked 2026-11-20
서울특별시 동작구 보라매로5길35 보라매파크스퀘어
- Region
- Seoul Special City
- Operator / developer
- 다우기술
- Public Power
- UPS: N+1 UPS
- Size & facility
- Published area figure unavailable
Address-based location · Facility record checked 2026-10-29
Project statusUnder construction경기도 용인시 수지구 죽전동 23-11·23-12·23-13
- Region
- Yongin, Gyeonggi Province
- Operator / developer
- 다우기술(개발·운영 예정)
- Public Power
- 수전·IT·계약전력 미확인
- Size & facility
- Unverified
Address-based location · Facility record checked 2026-11-20
강원특별자치도 춘천시 남산면 버들1길130 (수동리749)
- Region
- Gangwon Special Self-Governing Province
- Operator / developer
- 더존비즈온
- Public Power
- UPS: UPS·배터리 이중화
- Size & facility
- 전산실·코로케이션: 지하1층3,300㎡
Address-based location · Facility record checked 2026-10-29
부산광역시 금정구 금사동 106-1 외 3필지
- Region
- 부산 금정
- Operator / developer
- 더퍼스트37(개발)
- Public Power
- 계획 수전 90MW·서버실 60MW. 전력계약·실제 수전 개시는 미확인.
- Size & facility
- 대지 5,558.60㎡·연면적 51,186㎡·지하 6층/지상 7층 계획
Awaiting coordinate verification · Facility record checked 2026-11-21
대전광역시 유성구 가정북로145
- Region
- Daejeon Metropolitan City
- Operator / developer
- Lotte Innovate
- Public Power
- 수전·시설전력: 4,000kW · 비상발전: 5,000kW·72시간
- Size & facility
- 연면적·건물: 4,038㎡
Address-based location · Facility record checked 2026-10-29
서울특별시 금천구 가산디지털2로 179 (가산동 533-2) 롯데 서울 데이터센터
- Region
- Seoul Special City
- Operator / developer
- Lotte Innovate
- Public Power
- 수전·시설전력: 9,250kW · 비상발전: 6,000kW·자가발전70시간
- Size & facility
- 연면적·건물: 7,411㎡
Awaiting coordinate verification · Facility record checked 2026-11-20
경기도 용인시 기흥구 마북로240번길17-9
- Region
- Gyeonggi Province
- Operator / developer
- Lotte Innovate
- Public Power
- 수전·시설전력: 주선로20,000kW·예비선로20,000kW(합산 금지) · 비상발전: 39,120kW·48시간
- Size & facility
- Published area figure unavailable
Address-based location · Facility record checked 2026-10-29
경기도 용인시 기흥구 마북로240번길 17-9 롯데 글로벌 클라우드센터
- Region
- Gyeonggi Province
- Operator / developer
- Lotte Innovate
- Public Power
- 수전·시설전력: 주선로20,000kW·예비선로20,000kW(합산 금지) · 비상발전: 19,500kW·자가발전36시간
- Size & facility
- 연면적·건물: 16,352㎡
Awaiting coordinate verification · Facility record checked 2026-11-20
Project statusInvestment Agreements and Plans경기도 안산시
- Region
- Ansan, Gyeonggi Province
- Operator / developer
- 가비아·KINX(운영 예정) / 맥쿼리 MAIF4·가비아(개발)
- Public Power
- 사업: 계획규모 40MW · 수전·IT·전력계약 기준 미공 items
- Size & facility
- 첫 안산사업 계획규모 40MW
Awaiting coordinate verification · Facility record checked 2026-11-21