KOREA DATA CENTER DATABASE
Explore Korean data center locations and status.
Search by region, operator, and project stage, and switch between the list and map to check facility specifications and sources. Be sure to review the scope and timing of the publicly available data.
Latest facility record check 2026-10-19 · The verification date for each individual record is indicated in the details. The number of registered entries does not represent the total market size nationwide.
Looking for a center that meets your needs?
Tell us your preferred location, power requirement and timing so we can outline the facility conditions to check.
You can submit an initial inquiry without signing up.Saved regions and filters
Save up to 20 region, operator and project-stage filters to revisit current listings.
Loading saved filters…
Reopen current listings with saved filters. No email alerts are sent.
Official specification evidence 93records · latest check 2026-10-14. The listing of specifications does not imply verification of remaining capacity or the validity of certifications.
Centers by operator · 31entities
Current Search Results: Project Stage and Regional Distribution
These are registered sites that match your current search criteria.
This is distinct from overall market share nationwide.
Reference locations for each region are indicated by dotted borders. Centers with unconfirmed locations are also included in the list below.
Uijeongbu Yonghyeon-dong Data Center
522-8 Yonghyeon-dong, Uijeongbu-si, Gyeonggi-do · Verification Coordinates
New Construction of the Gaebong-dong Data Center
Operator verification in progress
166-2 Gaebong-dong, Guro-gu, Seoul
서울 구로구 개봉동 166-2 일원에서 추진되는 구로 데이터센터 신축사업입니다. 구로구 건축과의 공사 안전점검 수행기관 지정자료와 삼우씨엠의 건설사업관리 용역 발표로 동일 주소의 프로젝트를 확인합니다.
- Public Power
- Undisclosed
- Size & facility
- CM사 공개 연면적 19,255.39㎡·지하 4층/지상 8층(기존 행정원장 20,665㎡ 별도)
Data Center in Block 7, Oryong District, Muan
Project operator not disclosed
Support Block 7, Oryong-ri, Illo-eup, Muan-gun, Jeollanam-do, South Korea
무안 오룡지구 도시지원시설용지 지원7블록에 민간이 추진하는 데이터센터 계획입니다. 인근 아파트 밀집 주거지역과의 거리, 소음·열·경관에 관한 주민 의견이 건축허가 검토의 주요 쟁점으로 공개됐습니다.
- Public Power
- Definitions of “200MW-class planned and installed capacity,” “IT load,” and “UPS,” as well as KEPCO’s supply approval, have not been confirmed.
- Size & facility
- Site area: 37,695.2 m²; total floor area: 85,667 m²; 3 buildings; planned maximum height: 48 m
Data Center in Songjeong-dong, Busan
Operator verification in progress
1711-4 Songjeong-dong, Gangseo-gu, Busan Metropolitan City, and 4 other parcels
부산 강서구 송정동 녹산국가산업단지에 추진되는 방송통신시설 데이터센터 개발사업입니다. 해운대구 송정동의 통신센터와 구별되는 별도 사업지로, 대상 주소는 강서구 송정동 1711-4 외 4필지입니다.
- Public Power
- Undisclosed
- Size & facility
- 연면적 46,107.49㎡·지상 13층(옥탑층 포함)
Bucheon Naedong Data Center
Operator verification in progress
222-13 Naedong, Ojeong-gu, Bucheon-si, Gyeonggi-do, and 10 other parcels
경기 부천시 오정구 내동 222-13 외 10필지의 민간 데이터센터 개발사업입니다. 삼정동 센터와 함께 건축허가 사업으로 공개됐지만 건축물 규모와 전력 인입선로는 서로 다른 사업으로 관리합니다.
- Public Power
- Undisclosed
- Size & facility
- 1 basement level and 4 above-ground floors
Bucheon Samjeong-dong Data Center
Operator verification in progress
13-15 Samjeong-dong, Ojeong-gu, Bucheon-si, Gyeonggi-do
경기 부천시 오정구 삼정동 13-15의 민간 데이터센터 신축사업입니다. 부천시의회에 대한 시의 공식 답변에서 건축허가를 받은 삼정동·내동 2개 사업 중 하나로 구분됩니다.
- Public Power
- Undisclosed
- Size & facility
- 5 basement levels and 7 above-ground levels
Uijeongbu Yonghyeon-dong Data Center
Operator verification in progress
522-8 Yonghyeon-dong, Uijeongbu-si, Gyeonggi-do
경기 의정부시 용현동 522-8의 도심 산업단지 내 IDC 개발사업입니다. 코람코 공식 PFV 목록에서 케이인더스트리피에프브이의 의정부 용현 IDC로 소개되며, 기업과 금융기관 등 국내외 실수요자를 위한 설계를 제시합니다.
- Public Power
- 인입전력 20MW·IT 용량 12MW(사업자 공개)·잔여용량 미공개
- Size & facility
- 연면적 23,480.78㎡·지하 2층/지상 8층
Hanam Pungsan-dong Edge Data Center
Operator verification in progress
경기도 하남시 풍산동 595
경기 하남시 풍산동 595의 기존 건물을 데이터센터로 리모델링하는 엣지 데이터센터 사업입니다. 하남시의 2026년 안전점검 수행기관 지정공고에 사업주체·설계자·시공사와 건물 규모가 기재돼 있습니다.
- Public Power
- Undisclosed
- Size & facility
- 대지 2,946.7㎡·연면적 20,402.37㎡·지하 3층/지상 8층