KOREA DATA CENTER DATABASE

Explore Korean data center locations and status.

Search by region, operator, and project stage, and switch between the list and map to check facility specifications and sources. Be sure to review the scope and timing of the publicly available data.

Registered Business Sites101Includes operating and developing sites
Operating centers68Includes operation and expansion plans
Map Display85Address and area-level locations distinguished
Operating and Development Entities31Names linked to public centers

Latest facility record check 2026-10-19 · The verification date for each individual record is indicated in the details. The number of registered entries does not represent the total market size nationwide.

Looking for a center that meets your needs?

Tell us your preferred location, power requirement and timing so we can outline the facility conditions to check.

You can submit an initial inquiry without signing up.

Saved regions and filters

Save up to 20 region, operator and project-stage filters to revisit current listings.

Loading saved filters…

Reopen current listings with saved filters. No email alerts are sent.

Official specification evidence 93records · latest check 2026-10-14. The listing of specifications does not imply verification of remaining capacity or the validity of certifications.

Centers by operator · 31entities
Current Search Results: Project Stage and Regional Distribution
Search Results · Operation and Development Stages

These are registered sites that match your current search criteria.

  • Plan1 items
Search Results · Regional Distribution

This is distinct from overall market share nationwide.

  • Gunsan, Jeonbuk1 items

Search Results 1Location

Compare centers 0/3Comparison and full CSV require Research Pro.
Compare selected centers →
Map Display 1sites / results 1Location

Reference locations for each region are indicated by dotted borders. Centers with unconfirmed locations are also included in the list below.

Gunsan, JeonbukPlan

SGC Gunsan AI Data Center

SGC AI Infrastructure

SGC Green Power Site, 1331 Oehang-ro, Gunsan-si, Jeonbuk Special Self-Governing Province

SGC 군산 AI 데이터센터는 군산시 비응도동 일원에서 SGC그룹이 추진하는 AI 데이터센터 클러스터의 첫 단계입니다. 현대엔지니어링이 2026년 9월 28일 신축사업 수주를 공식 발표했으며, 60MW급 1단계와 장래 240MW 후속 개발을 구분해 소개했습니다.

Public Power
60 MW and 300 MW refer to phased planning capacities (definitions of power reception capacity and IT load not disclosed); claims regarding integration with on-site power generation; and KEPCO’s completion of power supply has not been confirmed.
Size & facility
전체 부지 115,702㎡·1단계 계획 규모 60MW·장기 총 300MW 구상
운영사·공식자료 확인Facility record checked 2026-10-19

Find a center and continue your review.

Please verify the facility’s publicly disclosed specifications and actual occupancy and supply conditions separately.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel