Changes in Data Centers, From the perspective necessary for the project.
From development and permitting to power and facilities, and from investment to transactions. Read about the key points of the announcement and the current stage.
Hyundai Steel launched H ONE, combining rolled and built-up H-beams, and outlined a structural-steel offering for the heavy-load, large-section and non-standard size requirements of AI data centers.
LG Electronics USA signed a definitive long-term agreement with AIR Control Concepts to supply high-efficiency chillers to AI data centers in the United States and Canada. The 5 GW figure is the aggregate scale of the supported data center portfolio, not cooling capacity or secured power in Korea.
Sejong City signed an MOU with SK Securities, Meteus Asset Management and Seed H to pursue a 360 MW-class AI data center by 2029. The investment plan and administrative support pledge are confirmed, but they do not mean that land, power, water or permits have been secured.
In a corrective disclosure by DL E&C, details regarding the revised contract amount, project site, planned IT load, and contract period for the Gimpo ICN11 project—commissioned by Digital Seoul 2—were confirmed.
Gimpo, Gyeonggi ProvinceConstruction and Contract Amendments
Korea Exchange (KRX), KIND, and Koscom Disclosures
Digital Realty has officially announced a case study detailing its support for Samsung Electronics’ enterprise IT infrastructure colocation at ICN10 in Seoul.
Read the presentation and prepare for the next steps.
We have organized the necessary documents and company procedures step by step, from the notice of intent through technical review, power system impact assessment, contract signing, and power connection.
We prioritize verifying original sources from government and public agencies as well as operators. Duplicate entries from the same announcement are consolidated, and subsequent announcements regarding contracts, construction, and operations are recorded as change history. We distinguish between MOUs, plans, groundbreakings, completions, and operations; the number of posts does not represent the total number of data centers nationwide. When a new source document is confirmed, we add the actual text rather than simply updating the date.