United States of America · Announced development projects

Denton data center, Texas

공식 원천의 전력 객체 · Published statement

Project stage · source basis
Stage requires verification · publisher_statement
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-03-02
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · primary:78ae306954efe51a4db1767c

Denton data center, Texas

data center project · Published statement

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
collection_field_gaps
  • fields
    • wue
    • water_supply_capacity
    • exact_connection_point
    • actual_energization_date
    reason
    No verified field-level original acquired for these attributes; null is not zero.
source_record_idr1:power_source:78ae306954ef:power_asset:21d36e722b15

No separate metric summary is available. Consult the detailed source fields.

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
investors.corescientific.com ↗

Data Source 2026-03-02 · Retrieved 2026-10-05

investors.corescientific.com

Source location inherited observation P015

Sources EV-aa0d048aeba0f6c9388fb83e
Evidence SHA-256 b324ad2335deef1f87c4124a99ce3cb7a66bb242ecec40753678787a02b7f11a · raw_http_response

Related power and facility evidence

Loading related evidence…

Start a consultation · Choose a channel