Arecleoch
Connection register · built
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 114 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-b7cba28ae78e002ea915c944 |
| MW Increase / Decrease | 0 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-b7cba28ae78e002ea915c944 |
| Cumulative Total Capacity (MW) | 114 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-b7cba28ae78e002ea915c944 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Arecleoch |
| Customer Name | SCOTTISHPOWER RENEWABLES (UK) LIMITED |
| Connection Site | Arecleoch 132/33kV |
| Stage | 1.00 |
| MW Connected | 114.00 |
| MW Increase / Decrease | 0.00 |
| Cumulative Total Capacity (MW) | 114.00 |
| MW Effective From | Not obtained |
| Project Status | Built |
| Agreement Type | Direct Connection |
| HOST TO | SPT |
| Plant Type | Wind Onshore |
| Project ID | a0l4L0000005itIQAQ |
| Project Number | PRO-000012-1 |
| Gate | Not obtained |
| Original text | Built |
| source_record_id | csv:row:77 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:77
Sources EV-b7cba28ae78e002ea915c944Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 d435576de82d702ee2df396b2c268cf8465542c908f9c9108413663e296259cb
Usage terms NESO Open Data Licence