17 Acres and BESS
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-9d965cda5325e671e1bf16cb |
| MW Increase / Decrease | 95.76 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-9d965cda5325e671e1bf16cb |
| Cumulative Total Capacity (MW) | 95.76 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-9d965cda5325e671e1bf16cb |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | 17 Acres and BESS |
| Customer Name | AEUK BATTERY PROJECT II LTD |
| Connection Site | 17 ACRES BESS 275KV SUBSTATION |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 95.76 |
| Cumulative Total Capacity (MW) | 95.76 |
| MW Effective From | 2032-06-30 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | SHET |
| Plant Type | Energy Storage System |
| Project ID | a0l8e0000012ezRAAQ |
| Project Number | PRO-004392 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:4 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:4
Sources EV-9d965cda5325e671e1bf16cbEvidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 6cfb11ba7a9bec38dc4a5bad55c2a25c795fbd76f6f167c35fc9b7740c14b9c6
Usage terms NESO Open Data Licence
