Aitkenhead Farm BESS
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-28fc12e870e62ce665c55f00 |
| MW Increase / Decrease | 300 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-28fc12e870e62ce665c55f00 |
| Cumulative Total Capacity (MW) | 300 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-28fc12e870e62ce665c55f00 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Aitkenhead Farm BESS |
| Customer Name | Aitkenhead Storage Facility Limited |
| Connection Site | Clydesmill 275/33kV |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 300.00 |
| Cumulative Total Capacity (MW) | 300.00 |
| MW Effective From | 2028-10-31 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | SPT |
| Plant Type | Demand;Energy Storage System |
| Project ID | a0l8e0000010wPWAAY |
| Project Number | PRO-002585 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:40 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:40
Sources EV-28fc12e870e62ce665c55f00Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 7018247a907496bb166e289960623518614455457aafc35702b87fb8d8c45984
Usage terms NESO Open Data Licence
