Balrobert Farm BESS
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-85bdb6fca74b2cf65d7a53f2 |
| MW Increase / Decrease | 150 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-85bdb6fca74b2cf65d7a53f2 |
| Cumulative Total Capacity (MW) | 150 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-85bdb6fca74b2cf65d7a53f2 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Balrobert Farm BESS |
| Customer Name | ELGIN ENERGY ES CO LIMITED |
| Connection Site | Knocknagael 132kV Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 150.00 |
| Cumulative Total Capacity (MW) | 150.00 |
| MW Effective From | 2032-10-31 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | SHET |
| Plant Type | Energy Storage System |
| Project ID | a0l8e000001HpUOAA0 |
| Project Number | PRO-004118 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:117 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:117
Sources EV-85bdb6fca74b2cf65d7a53f2Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 ad1684af975e032246fd620f4b997a9f81dcd3b9b848e1c4b674efa110f7ddf4
Usage terms NESO Open Data Licence