| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-5f0713e46d71d19074edabf9 |
| MW Increase / Decrease | 520 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-5f0713e46d71d19074edabf9 |
| Cumulative Total Capacity (MW) | 520 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-5f0713e46d71d19074edabf9 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Astwood Solar Farm GEC |
| Customer Name | ASTWOOD GREEN ENERGY LTD |
| Connection Site | West Anglia Connection Node G 400kV Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 520.00 |
| Cumulative Total Capacity (MW) | 520.00 |
| MW Effective From | 2034-10-31 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | NGET |
| Plant Type | Energy Storage System;PV Array (Photo Voltaic/solar) |
| Project ID | a0lJ9000000blKHIAY |
| Project Number | PRO-004799 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:90 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:90
Sources EV-5f0713e46d71d19074edabf9Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 9a32ffd099eb28f186de1158354e12cd7da014824f9a50846b4d622dc48bca58
Usage terms NESO Open Data Licence