AGS Nerston BESS
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-f46a8d10ecdd059b2f75beb4 |
| MW Increase / Decrease | 50 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-f46a8d10ecdd059b2f75beb4 |
| Cumulative Total Capacity (MW) | 50 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-f46a8d10ecdd059b2f75beb4 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | AGS Nerston BESS |
| Customer Name | Advance Grid Solutions Limited |
| Connection Site | East Kilbride B 275/33kV Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 50.00 |
| Cumulative Total Capacity (MW) | 50.00 |
| MW Effective From | 2033-10-31 |
| Project Status | Scoping |
| Agreement Type | Embedded |
| HOST TO | SPT |
| Plant Type | Energy Storage System |
| Project ID | a0l8e000001HrhsAAC |
| Project Number | PRO-004216 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:33 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:33
Sources EV-f46a8d10ecdd059b2f75beb4Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 894e854fe9fd384179e3d4c45df6e4ceb039e8a3728716aa3ad074098dea9378
Usage terms NESO Open Data Licence