Alverdiscott
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-35d90c0061ae36eb13d78315 |
| MW Increase / Decrease | 49.9 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-35d90c0061ae36eb13d78315 |
| Cumulative Total Capacity (MW) | 49.9 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-35d90c0061ae36eb13d78315 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Alverdiscott |
| Customer Name | PIVOTED POWER LLP |
| Connection Site | Alverdiscott 400kV Substation |
| Stage | 1.00 |
| MW Connected | 0.00 |
| MW Increase / Decrease | 49.90 |
| Cumulative Total Capacity (MW) | 49.90 |
| MW Effective From | 2029-10-31 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | NGET |
| Plant Type | Energy Storage System |
| Project ID | a0l4L0000005ieSQAQ |
| Project Number | PRO-001136-1 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:56 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:56
Sources EV-35d90c0061ae36eb13d78315Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 ef5897cbcdce6263bdbacb06932707146954e048e1b2079e8b0e720c163a3b34
Usage terms NESO Open Data Licence