Ballach
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-f38458292aacabe96e69dcbc |
| MW Increase / Decrease | 149 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-f38458292aacabe96e69dcbc |
| Cumulative Total Capacity (MW) | 149 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-f38458292aacabe96e69dcbc |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Ballach |
| Customer Name | ENERGYFARM UK BALLACH LTD |
| Connection Site | New North West 132kV Substation |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 149.00 |
| Cumulative Total Capacity (MW) | 149.00 |
| MW Effective From | 2037-10-31 |
| Project Status | Scoping |
| Agreement Type | Direct Connection |
| HOST TO | SHET |
| Plant Type | Energy Storage System;Wind Onshore |
| Project ID | a0lJ9000000PNJcIAO |
| Project Number | PRO-005977 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:113 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:113
Sources EV-f38458292aacabe96e69dcbcEvidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 aeff24621576774b0e2c787cc2a439e472d7de3d0b72a70356ec7e1c0289ad49
Usage terms NESO Open Data Licence