Achlachan
Connection register · built
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 20 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-d082c256c1cbb3b068b9c135 |
| MW Increase / Decrease | 0 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-d082c256c1cbb3b068b9c135 |
| Cumulative Total Capacity (MW) | 20 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-d082c256c1cbb3b068b9c135 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Achlachan |
| Customer Name | ACHLACHAN WIND FARM LLP |
| Connection Site | Mybster 132/33kV Substation |
| Stage | Not obtained |
| MW Connected | 20.00 |
| MW Increase / Decrease | 0.00 |
| Cumulative Total Capacity (MW) | 20.00 |
| MW Effective From | Not obtained |
| Project Status | Built |
| HOST TO | SHET |
| Plant Type | Wind Onshore |
| Project ID | a0l4L0000005iSZQAY |
| Project Number | PRO-000964 |
| Gate | Not obtained |
| Original text | Built |
| source_record_id | csv:row:9 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:9
Sources EV-d082c256c1cbb3b068b9c135Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 07b86644e5cf8d440b8afaed4e4c5ec2b1c9fea344b3b2f22f2d8880f2891efe
Usage terms NESO Open Data Licence