Balmore WTW
Connection register · built
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 5.15 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-dc9404113ade165d100e72dc |
| MW Increase / Decrease | 0 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-dc9404113ade165d100e72dc |
| Cumulative Total Capacity (MW) | 5.15 MW | Original source column definition · project stage · Built As-of date 2026-10-01 Sources EV-dc9404113ade165d100e72dc |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Balmore WTW |
| Customer Name | SP DISTRIBUTION PLC |
| Connection Site | Killermont 132/33kV |
| Stage | Not obtained |
| MW Connected | 5.15 |
| MW Increase / Decrease | 0.00 |
| Cumulative Total Capacity (MW) | 5.15 |
| MW Effective From | Not obtained |
| Project Status | Built |
| HOST TO | SPT |
| Plant Type | PV Array (Photo Voltaic/solar) |
| Project ID | a0l4L0000005ib5QAA |
| Project Number | PRO-002030 |
| Gate | Not obtained |
| Original text | Built |
| source_record_id | csv:row:41 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:41
Sources EV-dc9404113ade165d100e72dcEvidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 5087496aa7254df2d5376666e409bf0419422da9a178e8f969f30bfb9ed0190f
Usage terms NESO Open Data Licence