Clachan GSP
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-d3d2f24939cfe1be14141217 |
| MW Increase / Decrease | 0.42 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-d3d2f24939cfe1be14141217 |
| Cumulative Total Capacity (MW) | 0.42 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-d3d2f24939cfe1be14141217 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Clachan GSP |
| Customer Name | Scottish Hydro Electric Power Distribution Plc |
| Connection Site | Clachan GSP |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 0.42 |
| Cumulative Total Capacity (MW) | 0.42 |
| MW Effective From | 2025-09-30 |
| Project Status | Scoping |
| HOST TO | SHET |
| Plant Type | Demand;Hydro |
| Project ID | a0l8e000000TPPAAA4 |
| Project Number | PRO-003387 |
| Gate | Not obtained |
| Original text | Scoping |
| source_record_id | csv:row:138 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:138
Sources EV-d3d2f24939cfe1be14141217Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 e91e1baf885a8a885fa09e998e55068a3535274dc967bc3c801209537f327652
Usage terms NESO Open Data Licence