Balgonie Solar and BESS
Connection register · scoping
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| MW Connected | 0 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-62c0add5c6091c22f88c3271 |
| MW Increase / Decrease | 60 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-62c0add5c6091c22f88c3271 |
| Cumulative Total Capacity (MW) | 60 MW | Original source column definition · project stage · Scoping As-of date 2026-10-01 Sources EV-62c0add5c6091c22f88c3271 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Project Name | Balgonie Solar and BESS |
| Customer Name | GREENTECH PROJECTS HOLDING UK LIMITED |
| Connection Site | ABERNETHY 2 400/33KV GRID SUPPLY POINT SUBSTATION |
| Stage | Not obtained |
| MW Connected | 0.00 |
| MW Increase / Decrease | 60.00 |
| Cumulative Total Capacity (MW) | 60.00 |
| MW Effective From | 2033-10-31 |
| Project Status | Scoping |
| HOST TO | SHET |
| Plant Type | Energy Storage System;PV Array (Photo Voltaic/solar) |
| Project ID | a0lJ9000000PDtJIAW |
| Project Number | PRO-005047 |
| Gate | 1 |
| Original text | Scoping |
| source_record_id | csv:row:36 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-10-01 · Retrieved 2026-10-05
Supported by National Energy SO Open Data
Source location csv:row:36
Sources EV-62c0add5c6091c22f88c3271Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 a6d8be8066df00330c9dd2acdd2418bfc6889cc3d3b99acf8ceb3b78b84f9473
Usage terms NESO Open Data Licence