United Kingdom · Connection-site name reference

Bendsmoor BESS 400Kv Substation

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-10-01
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · GBR · neso_tec

Bendsmoor BESS 400Kv Substation

Connection-site name reference · Unverified

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
source_record_idBendsmoor BESS 400Kv Substation

No separate metric summary is available. Consult the detailed source fields.

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:160

Sources EV-42482ecb847dd85df36e6bb4
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 bef41bbf3afbefe78a32e74afbba1e5b347b39e0720f25222ab8ef65324022e2

Usage terms NESO Open Data Licence

Related power and facility evidence

Loading related evidence…

Start a consultation · Choose a channel