Australia · Generator · plant location

Borambola Hybrid - KCI

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Borambola Hybrid - KCI

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)6.5 MWdcOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-09a752bc421a637b6577979b
Unit Capacity (MW AC)5 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-09a752bc421a637b6577979b
Aggregated Nameplate Capacity (MW DC)130 MWdcOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-09a752bc421a637b6577979b
Aggregated Nameplate Capacity (MW AC)100 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-09a752bc421a637b6577979b
Detailed source fields
Original source fieldPublished value or condition
Survey ID3266
Site NameBorambola Hybrid - KCI
KCI IdN00290
Site OwnerBritish Solar Renewables Pty Ltd
RegionNSW1
Max Site Capacity (AC)90
Gen Info Unit ID326601
Unit NameBorambola Hybrid Solar
Technology TypeSolar PV
Technology DetailSingle Axis Tracking
Dispatch TypeSemi-scheduled
Unit Count20
Unit Capacity (MW DC)6.5
Unit Capacity (MW AC)5
Aggregated Nameplate Capacity (MW DC)130
Aggregated Nameplate Capacity (MW AC)100
Commitment StatusPublicly Announced
Full Commercial Use Date2031-08-01T00:00:00
Expected Closure Year2061
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-05-29T13:15:18
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textPublicly Announced
source_record_idGenerator Information:163

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:163

Sources EV-09a752bc421a637b6577979b
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 17fce13568e28cda768de2ec4f34afa955e9cb1609f848659e706f4481f547d7

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel