Australia · Generator · plant location

Birriwa BESS

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Birriwa BESS

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)230 MWdcOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-ad2aab157c2fb830ae567224
Unit Capacity (MW AC)230 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-ad2aab157c2fb830ae567224
Aggregated Nameplate Capacity (MW DC)230 MWdcOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-ad2aab157c2fb830ae567224
Aggregated Nameplate Capacity (MW AC)230 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-ad2aab157c2fb830ae567224
Agg Nameplate Storage Capacity (MWh)920 MWhOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-ad2aab157c2fb830ae567224
Detailed source fields
Original source fieldPublished value or condition
Survey ID3031
Site NameBirriwa BESS
Site OwnerACEN RENEWABLES
RegionNSW1
Max Site Capacity (AC)460
Gen Info Unit ID303101
Unit NameBWB_GU1
Technology TypeBattery Storage
Technology DetailLithium-ion
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW DC)230
Unit Capacity (MW AC)230
Aggregated Nameplate Capacity (MW DC)230
Aggregated Nameplate Capacity (MW AC)230
Agg Nameplate Storage Capacity (MWh)920
Commitment StatusPublicly Announced
Full Commercial Use Date2031-03-07T00:00:00
Expected Closure Year2080
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-06-02T15:09:08
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textPublicly Announced
source_record_idGenerator Information:110

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:110

Sources EV-ad2aab157c2fb830ae567224
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 29867311caa00c81850d91bb363dcceb9b9665d9084fd24fcea49f3149fbb2a6

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

Start a consultation · Choose a channel