Birriwa Hybrid

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Birriwa Hybrid

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)600 MWdcOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-48215879da98a1e554522a57
Unit Capacity (MW AC)600 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-48215879da98a1e554522a57
Aggregated Nameplate Capacity (MW DC)600 MWdcOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-48215879da98a1e554522a57
Aggregated Nameplate Capacity (MW AC)600 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-48215879da98a1e554522a57
Agg Nameplate Storage Capacity (MWh)2400 MWhOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-48215879da98a1e554522a57
Detailed source fields
Original source fieldPublished value or condition
Survey ID3030
Site NameBirriwa Hybrid
Site OwnerACEN RENEWABLES
RegionNSW1
Max Site Capacity (AC)700
Gen Info Unit ID303002
Unit NameBWSF_GU2
Technology TypeBattery Storage
Technology DetailLithium-ion
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW DC)600
Unit Capacity (MW AC)600
Aggregated Nameplate Capacity (MW DC)600
Aggregated Nameplate Capacity (MW AC)600
Agg Nameplate Storage Capacity (MWh)2400
Commitment StatusPublicly Announced
Full Commercial Use Date2029-11-08T00:00:00
Expected Closure Year2080
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-06-02T10:41:56
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textPublicly Announced
source_record_idGenerator Information:113

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:113

Sources EV-48215879da98a1e554522a57
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b0413c8f9572cf6435b002170c914b91f0f9a559debf86528196e776a87433d6

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

Start a consultation · Choose a channel