Australia · Generator · plant location

Awaba BESS

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Awaba BESS

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)1.93 MWdcOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-2f856eda74be4c437a980e26
Unit Capacity (MW AC)1.93 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-2f856eda74be4c437a980e26
Aggregated Nameplate Capacity (MW DC)54.04 MWdcOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-2f856eda74be4c437a980e26
Aggregated Nameplate Capacity (MW AC)54.04 MWacOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-2f856eda74be4c437a980e26
Agg Nameplate Storage Capacity (MWh)107.8 MWhOriginal source column definition · Generation-register unit · Publicly Announced
As-of date 2026-07-31
Sources EV-2f856eda74be4c437a980e26
Detailed source fields
Original source fieldPublished value or condition
Survey ID2974
Site NameAwaba BESS
Site Ownerfirmpower_NR
RegionNSW1
Max Site Capacity (AC)50
Gen Info Unit ID297401
Unit NameA1B
Technology TypeBattery Storage
Technology DetailLithium-ion
Dispatch TypeScheduled
Unit Count28
Unit Capacity (MW DC)1.93
Unit Capacity (MW AC)1.93
Aggregated Nameplate Capacity (MW DC)54.04
Aggregated Nameplate Capacity (MW AC)54.04
Agg Nameplate Storage Capacity (MWh)107.8
Commitment StatusPublicly Announced
Full Commercial Use Date2028-12-22T00:00:00
Expected Closure Year2047
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-05-22T13:17:54
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textPublicly Announced
source_record_idGenerator Information:36

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:36

Sources EV-2f856eda74be4c437a980e26
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 f1d377e10d838ae6619a4a6a652dd4758d97a782a81f5b46f903906d28608478

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

Start a consultation · Choose a channel