Australia · Generator · plant location

Brendale BESS

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Brendale BESS

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)1.83 MWdcOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-7ab2e82bd472e9e045c36153
Unit Capacity (MW AC)1.83 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-7ab2e82bd472e9e045c36153
Aggregated Nameplate Capacity (MW DC)204.96 MWdcOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-7ab2e82bd472e9e045c36153
Aggregated Nameplate Capacity (MW AC)204.96 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-7ab2e82bd472e9e045c36153
Agg Nameplate Storage Capacity (MWh)409.92 MWhOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-7ab2e82bd472e9e045c36153
Detailed source fields
Original source fieldPublished value or condition
Survey ID2526
Site NameBrendale BESS
KCI IdQ00037
Site OwnerBrendale Battery ProjectCo Pty Lt
RegionQLD1
Max Site Capacity (AC)205
Gen Info Unit ID252601
Unit NameBDBS_GU1
Technology TypeBattery Storage
Technology DetailLithium-ion
DUIDBRNDBES1
Dispatch TypeScheduled
Unit Count112
Unit Capacity (MW DC)1.83
Unit Capacity (MW AC)1.83
Aggregated Nameplate Capacity (MW DC)204.96
Aggregated Nameplate Capacity (MW AC)204.96
Agg Nameplate Storage Capacity (MWh)409.92
Commitment StatusIn Service
Full Commercial Use Date2026-01-15T00:00:00
Expected Closure Year2066
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-05-25T09:39:11
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:190

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:190

Sources EV-7ab2e82bd472e9e045c36153
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 852170a6c6b4c4c2aed88e9bfbb997d84ebb2f57924435eaaa543b7e33d7f706

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:84

Sources EV-947b68da28c5bd8638ed9829
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 c5d7219039aa324c7dd4862857e4ac312931ee5e5a907b34c43832e7b6e98806

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel