Blackwater Hybrid System
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Unit Capacity (MW DC) | 3.47 MWdc | Original source column definition · Generation-register unit · Publicly Announced As-of date 2026-07-31 Sources EV-a97cf3f94e9197f8a3c494f5 |
| Unit Capacity (MW AC) | 3.4 MWac | Original source column definition · Generation-register unit · Publicly Announced As-of date 2026-07-31 Sources EV-a97cf3f94e9197f8a3c494f5 |
| Aggregated Nameplate Capacity (MW DC) | 173.5 MWdc | Original source column definition · Generation-register unit · Publicly Announced As-of date 2026-07-31 Sources EV-a97cf3f94e9197f8a3c494f5 |
| Aggregated Nameplate Capacity (MW AC) | 170 MWac | Original source column definition · Generation-register unit · Publicly Announced As-of date 2026-07-31 Sources EV-a97cf3f94e9197f8a3c494f5 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Survey ID | 2432 |
| Site Name | Blackwater Hybrid System |
| KCI Id | Q00048 |
| Site Owner | Blackwater Project Nominees Pty Ltd as trustee for the Blackwater Project Trust |
| Region | QLD1 |
| Max Site Capacity (AC) | 270 |
| Gen Info Unit ID | 243202 |
| Unit Name | BHS_SF |
| Technology Type | Solar PV |
| Technology Detail | Single Axis Tracking |
| Dispatch Type | Semi-scheduled |
| Unit Count | 50 |
| Unit Capacity (MW DC) | 3.47 |
| Unit Capacity (MW AC) | 3.4 |
| Aggregated Nameplate Capacity (MW DC) | 173.5 |
| Aggregated Nameplate Capacity (MW AC) | 170 |
| Commitment Status | Publicly Announced |
| Full Commercial Use Date | 2030-10-06T00:00:00 |
| Expected Closure Year | 2062 |
| Survey Last Requested Date | 2026-03-10T00:00:00 |
| Survey Latest Update Date | 2026-05-21T14:37:25 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| Original text | Publicly Announced |
| source_record_id | Generator Information:119 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:119
Sources EV-a97cf3f94e9197f8a3c494f5Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 5e04b7edbac2b54e51e396070f5ffde75454fc3f93f0c302467ec2d4682b1a63
Usage terms AEMO general copyright permission subject to exceptions
