Australia · Generator · plant location

Avonlie Solar Farm

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Avonlie Solar Farm

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)3.63 MWdcOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-aeae7dd553d6fcf98f3eb2e0
Unit Capacity (MW AC)3.63 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-aeae7dd553d6fcf98f3eb2e0
Aggregated Nameplate Capacity (MW DC)254.1 MWdcOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-aeae7dd553d6fcf98f3eb2e0
Aggregated Nameplate Capacity (MW AC)254.1 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-aeae7dd553d6fcf98f3eb2e0
Detailed source fields
Original source fieldPublished value or condition
Survey ID1715
Site NameAvonlie Solar Farm
Site OwnerIberdrola Australia Limited
RegionNSW1
Max Site Capacity (AC)245
Gen Info Unit ID171502
Unit NameAVSF1
Technology TypeSolar PV
Technology DetailSingle Axis Tracking
DUIDAVLSF1
Dispatch TypeSemi-scheduled
Unit Count70
Unit Capacity (MW DC)3.63
Unit Capacity (MW AC)3.63
Aggregated Nameplate Capacity (MW DC)254.1
Aggregated Nameplate Capacity (MW AC)254.1
Commitment StatusIn Service
Expected Closure Year2058
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-06-17T15:42:20
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:35

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:35

Sources EV-aeae7dd553d6fcf98f3eb2e0
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 0d2193952aabd14c9fbe1b68f9b153f54a08fd22ded40e492f742bfbfec36a81

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:14

Sources EV-6e74b437d9d89d5822636c3a
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 3ee1dbd5faaf673a4bdac1dcd4fd92e44fb3cd1a7254048956a8060aa390c1e0

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

Start a consultation · Choose a channel