Australia · Generator · plant location

Bodangora Wind Farm

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Bodangora Wind Farm

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW DC)3.43 MWdcOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-b3b5ad99663c693e2f44235a
Unit Capacity (MW AC)3.43 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-b3b5ad99663c693e2f44235a
Aggregated Nameplate Capacity (MW DC)113.19 MWdcOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-b3b5ad99663c693e2f44235a
Aggregated Nameplate Capacity (MW AC)113.19 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-b3b5ad99663c693e2f44235a
Detailed source fields
Original source fieldPublished value or condition
Survey ID1259
Site NameBodangora Wind Farm
Site OwnerBodangora Wind Farm Pty Ltd
RegionNSW1
Max Site Capacity (AC)111.3
Gen Info Unit ID125901
Unit NameBodangora Wind Farm:Units 1-33
Technology TypeWind
Technology DetailOnshore
DUIDBODWF1
Dispatch TypeSemi-scheduled
Unit Count33
Unit Capacity (MW DC)3.43
Unit Capacity (MW AC)3.43
Aggregated Nameplate Capacity (MW DC)113.19
Aggregated Nameplate Capacity (MW AC)113.19
Commitment StatusIn Service
Expected Closure Year2049
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-06-17T15:40:34
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:136

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:136

Sources EV-b3b5ad99663c693e2f44235a
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 5364546a37a617faddea3b44716598e0ef68a34cf1e01387b22cac9c625ae7fa

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:59

Sources EV-34f6b6dccd2beb74ac713a8b
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 4899873a486aa972cc646b75a0652f374bc940c2fc7eca3617bd3f45fccbfac2

Usage terms AEMO general copyright permission subject to exceptions