Data Source Not stated · Retrieved 2026-10-05
South Korea · Announced development projects
마곡 AI DC
Development announcement · verify each phase
- Project stage · source basis
- Planned / preconstruction · developer_project_no_commissioning_verified
- Reported operator
- Check each original source
- Address
- Check each original source
- Data Reference Date
- Not stated
- Collection review date
- 2026-10-05
- Location meaning
- Location meaning unverified · Accuracy not disclosed
- Coordinates and geometry
- Coordinates need review
These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.
Metrics, specifications and scope
| Indicators | Source value | Basis, scope and stage | Period and evidence |
|---|---|---|---|
| Power Reception Capacity | 3 MW | Power Supply · Project · Undisclosed | Not stated Evidence for this value |
| site area | 419.66 pyeong | site area · Project · Undisclosed | Not stated Evidence for this value |
| delivery role | 개발 | Published statement · Project · publisher reported | Not stated Evidence for this value |
| evidence limit | 수전용량 표기. IT부하·계약전력·가용전력 여부와 인허가·가동일은 미공개. | disclosure review · Project · publisher reported | Not stated Evidence for this value |
Sources and terms of use
Data Source Not stated · Retrieved 2026-10-07
Related power and facility evidence
Loading related evidence…
