South Korea · Announced development projects

마곡 AI DC

Development announcement · verify each phase

Project stage · source basis
Planned / preconstruction · developer_project_no_commissioning_verified
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
Not stated
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Metrics, specifications and scope

IndicatorsSource valueBasis, scope and stagePeriod and evidence
Power Reception Capacity3 MWPower Supply · Project · UndisclosedNot stated
Evidence for this value
site area419.66 pyeongsite area · Project · UndisclosedNot stated
Evidence for this value
delivery role개발Published statement · Project · publisher reportedNot stated
Evidence for this value
evidence limit수전용량 표기. IT부하·계약전력·가용전력 여부와 인허가·가동일은 미공개.disclosure review · Project · publisher reportedNot stated
Evidence for this value

Sources and terms of use


Source terms of use

Related power and facility evidence

Loading related evidence…

Start a consultation · Choose a channel