Data Center Database/Naver·Naver Cloud/Chuncheon, Gangwon Province
● Operations

Naver Data Center Gak, Chuncheon

1154-79 Sunhwan-daero, Dong-myeon, Chuncheon-si, Gangwon Special Self-Governing Province

Center OverviewPhysical Sites · PowerSame operator
Operational StatusOperations

Operations began in June 2013

Public PowerEach is 1/6.75 the size of Sejong; verify official comparisons and absolute values separately.

Distinguish between power supply, UPS, and IT load

Facility SizeTotal floor area: 46,850 ㎡ · Approximately 100,000 units

On-premises and Cloud

Confirm move-in conditions at this center.

Discuss facility, power and network requirements → · Compare published Korean rental products

CENTER OVERVIEW

About the Center

This is Naver’s first in-house data center, built using its own design, construction, and operation technologies. Its key features include disaster risk diversification outside the Seoul metropolitan area and cooling using natural outside air.

01Operations began in 2013
02Total floor area: 46,850 ㎡ · Approximately 100,000 units
03Outdoor air cooling; emergency power designed for approximately 70 hours

AI-DC KOREA ANALYSIS

Interpretation and Verification Points

The total floor area, server capacity units, and the start of operations have been officially confirmed. While the power supply capacity ratios relative to each Sejong site have been disclosed, the current absolute power supply capacity and IT load remain subject to separate verification.

Principles for Interpreting Numbers

Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.

RESEARCH PRO

Cross-Reference Data and Licensing Detail Ledger

We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.

Start a consultation · Choose a channel