Address · Land Area (㎡·pyeong) · Land Classification · Zoning
Planned Gross Floor Area · Estimated Power Requirements
Locations of nearby substations
DATA CENTER SITE SCREENING
Data center site review,
Start by checking the address.
Review land, planned scale, infrastructure, earthquakes, climate, water and parcel slope, landslide and flood evidence.Take a free look at the basics, and
Please review the specific terms of the project.
KEPCO Supply Terms · Power Grid Plans and Commissioning Schedule
Potential Connection Sites · Actual Development Scale · Permits and Approvals
Detailed report containing supporting evidence and verification details
Items for which data is unavailable or retrieval is delayed are marked as “Needs Verification” and are not deemed non-compliant.
Site Review Guide
What information can I access for free?
회원가입·로그인 후 주소와 토지면적(㎡·평), 지목·용도지역, 건폐율·용적률과 계획 연면적, 예상 필요전력, 주변 변전소 위치를 무료로 볼 수 있습니다. 원자료가 확인된 항목만 표시합니다.
What is verified during a detailed review?
The designated representative will review the development scale, power requirements, power grid plans, potential connection points, infrastructure, permits and licenses, and environmental considerations, and will provide guidance on items requiring verification.
Can I determine whether development is possible just by looking up an address?
This cannot be confirmed based on basic information alone. Additional review of power supply conditions, regulations, and on-site conditions is required.
Does the absence of reference data mean the land cannot be developed?
No. Missing data or delays in retrieval do not constitute a non-compliance determination. You may submit a separate request for review by providing the address.
