Operational
LG U+ Anyang Center
37 Deokcheon-ro 48beon-gil, Manan-gu, Anyang-si, Gyeonggi-do
Distinguish between power supply, UPS, and IT load
Commercial and Telecommunications
Confirm move-in conditions at this center.
Discuss facility, power and network requirements → · Compare published Korean rental productsCENTER OVERVIEW
About the Center
평촌 권역과 별개인 안양 만안구 지역 거점. I checked the center names and locations on the official national IDC page. This is
AI-DC KOREA ANALYSIS
Interpretation and Verification Points
While the existence and location of the operating centers have been officially confirmed, the power capacity, IT load, floor space, and year of opening have not been confirmed based solely on publicly available data. We will not display estimated values until additional data is confirmed.
Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.
Cross-Reference Data and Licensing Detail Ledger
We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.
