● Operations기업·클라우드 데이터센터

SK AX 대덕 데이터센터

대전광역시 유성구 엑스포로 325

Public source documents 2 · Last reviewed 2026-11-20

Total incoming and facility power수전·IT 전력 미확인

Separate from IT, UPS and standby power

Total IT load-

Facility specification · separate from current availability

Total physical racks-

Facility rack count · separate from remaining inventory

IT room and colocation area-

Separate from gross floor and building area

FACILITY INTELLIGENCE

Facility at a glance

SK AX 대덕 데이터센터 · Operations

Operations
Select a topic to explore
SK AX 대덕 데이터센터: schematic of facility systems. Shows relationships among published specifications, not actual layouts or equipment counts.Power · Cooling · ServersSchematic Cooling flow Power supplyIncoming feeds Cooling equipmentSpecifications unconfirmed Server equipmentConceptual layout Power · Cooling · Servers
IT LoadUnverified
Supported power per rackUnverified
Cooling technologyUnverified
Last reviewed 2026-11-20Facility specifications · Separate from current availability

Current status

CURRENT STATUS / FACILITY

Current facility status and operating features

Operations · 운영시설 기록 · 개관일 미확인

Distinguish total facility capacity from capacity currently available to lease.

Operation and development
SK주식회사 AX
Facility type
기업·클라우드 데이터센터
Building and facility size
Unverified
Verify data
2026-11-20

Loading project participants…

FACILITY PROFILE

About this data center

대전 유성 · 기업·클라우드 데이터센터

Some original descriptions below are in Korean. Request an English review of this facility →

SK AX가 대전 유성구에서 운영하는 대덕 데이터센터다. 과거 명칭은 SK C&C 대덕 데이터센터다.

  • 01운영시설 기록 · 개관일 미확인
  • 02수전·IT 전력 미확인

LOCATION & ACCESS

Location and surrounding area

상세주소 확인

Detailed location under review

Verified facility coordinates are not yet available.
Use the maps below to search for the published address or center name.

Public address대전광역시 유성구 엑스포로 325

The facility location will be shown once further information is available.

FACILITIES & SERVICES

Facilities and operating features

Based on public information for this facility.
Operating and Development Entities
SK주식회사 AX
Facility type
기업·클라우드 데이터센터
Building and facility size
Unverified
Public Power
수전·IT 전력 미확인
Project Phases
Operations
Opening and announced dates
운영시설 기록 · 개관일 미확인
How to interpret the specifications

운영기관 자료에 기재된 시설이며 AI 전용 시설 또는 현재 임대 가능 용량을 뜻하지 않습니다.

Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.

Colocation and lease terms

Loading space availability and lease terms…

Want to know the colocation conditions at this center?

The center name is prefilled in your inquiry. Add your required capacity and timing if known.

You can submit an initial inquiry without signing up.

Participants and investment

Loading participants, investments and delivery history…

Development and completion history

PERMIT & DEVELOPMENT

Permitting and development history

Operations · Check the scope of each building permit, construction start and use approval record.

Search the permit register →
Operation and opening
운영시설 기록 · 개관일 미확인

Power, cooling and building

Loading power, cooling and building specifications…

Sources and review history

SOURCES & UPDATES

Sources and review dates

The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.

Public source documents 2records · latest check 2026-11-20

  1. 01
    SK주식회사AX 데이터센터 ↗

    SK주식회사AX

    Source reference date Not stated · Observed 2026-11-20

  2. 02
    데이터센터 화재안전컨설팅 ↗

    Daejeon Metropolitan City

    Source reference date Not stated · Observed 2026-11-20

Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.

Suggest a correction or provide information →

Loading linked supporting evidence…

Loading additional records…

Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel