NHN클라우드 FactoryX 장성 AI 데이터센터 계획
전남광주통합특별시 장성군 광주연구개발특구
Public source documents 2 · Last reviewed 2026-11-21
Facility specification · separate from current availability
Facility rack count · separate from remaining inventory
Separate from gross floor and building area
FACILITY INTELLIGENCE
Facility at a glance
NHN클라우드 FactoryX 장성 AI 데이터센터 계획 · Plan
Permit, construction and use-approval milestones reflect the scope of each documented record.
Current status
Current facility status and operating features
Plan · 2027년 내 준공 목표(2026년 11월 발표)
Distinguish total facility capacity from capacity currently available to lease.
- Operation and development
- NHN클라우드(자체 구축·운영 예정)
- Facility type
- 계획 단계 AI·GPU 데이터센터
- Building and facility size
- 자체 신규 인프라 10MW 계획
- Verify data
- 2026-11-21
Loading project participants…
FACILITY PROFILE
About this data center
전남 장성 · 계획 단계 AI·GPU 데이터센터Some original descriptions below are in Korean. Request an English review of this facility →
NHN클라우드가 광주연구개발특구에서 자체 구축을 추진하는 FactoryX 장성 계획입니다.
- 01자체 구축 계획
- 02Targeted for completion in 2027
LOCATION & ACCESS
Location and surrounding area
사업구역 확인 · 공개된 사업권역입니다. 개별 필지·건물과 정확한 시설 위치는 아직 확인되지 않았습니다.
Verified facility coordinates are not yet available.
Use the maps below to search for the published address or center name.
The facility location will be shown once further information is available.
FACILITIES & SERVICES
Facilities and operating features
Based on public information for this facility.- Operating and Development Entities
- NHN클라우드(자체 구축·운영 예정)
- Facility type
- 계획 단계 AI·GPU 데이터센터
- Building and facility size
- 자체 신규 인프라 10MW 계획
- Public Power
- 자체: 인프라 계획규모 10MW · 수전·IT·전력계약 기준 미공 items
- Project Phases
- Plan
- Opening and announced dates
- 2027년 내 준공 목표(2026년 11월 발표)
How to interpret the specifications
NHN의 2026년 11월 실적자료는 자체 장성센터와 장성파인 임차센터를 별도로 기재합니다. 10MW 자체계획은 NHN 전체 100MW 포트폴리오 목표에 포함되며, 장성파인 26MW와 같은 시설로 연결하지 않습니다.
Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.
Colocation and lease terms
Loading space availability and lease terms…
Want to know the colocation conditions at this center?
The center name is prefilled in your inquiry. Add your required capacity and timing if known.
You can submit an initial inquiry without signing up.Participants and investment
Loading participants, investments and delivery history…
Development and completion history
Permitting and development history
Plan · Check the scope of each building permit, construction start and use approval record.
Search the permit register →- Operation and opening
- 2027년 내 준공 목표(2026년 11월 발표)
Power, cooling and building
Loading power, cooling and building specifications…
Sources and review history
SOURCES & UPDATES
Sources and review dates
The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.Public source documents 2records · latest check 2026-11-21
- 01
- 02
Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.
Suggest a correction or provide information →Loading linked supporting evidence…
Loading additional records…
Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.