Separate from IT, UPS and standby power
DCK·오케스트로 여의도 Edge AI 데이터센터 계획
서울특별시 영등포구 여의도 권역
Public source documents 2 · Last reviewed 2026-11-21
Facility specification · separate from current availability
Facility rack count · separate from remaining inventory
Separate from gross floor and building area
FACILITY INTELLIGENCE
Facility at a glance
DCK·오케스트로 여의도 Edge AI 데이터센터 계획 · Plan
Permit, construction and use-approval milestones reflect the scope of each documented record.
Current status
Current facility status and operating features
Plan · 2027년 상반기(국문)·2027년 4분기(영문) 목표
Distinguish total facility capacity from capacity currently available to lease.
- Operation and development
- DCK·오케스트로(공동개발 계획)
- Facility type
- 계획 단계 엣지 AI 데이터센터
- Building and facility size
- 센터: 사용 층·구역 미공 items
- Verify data
- 2026-11-21
Loading project participants…
FACILITY PROFILE
About this data center
Yeongdeungpo, Seoul · 계획 단계 엣지 AI 데이터센터Some original descriptions below are in Korean. Request an English review of this facility →
DCK가 오케스트로와의 합작계획으로 제시한 여의도 엣지 AI 데이터센터입니다.
- 01DCK·오케스트로 합작계획
- 02국·영문 개소목표 차이
LOCATION & ACCESS
Location and surrounding area
행정구역 확인 · 재확인한 회사소개서는 여의도 권역을 제시합니다. 신사옥의 센터 사용 층·구역과 정확한 시설 위치는 추가 확인이 필요합니다.
The map shows the area center. The facility address and site boundary are not confirmed.
FACILITIES & SERVICES
Facilities and operating features
Based on public information for this facility.- Operating and Development Entities
- DCK·오케스트로(공동개발 계획)
- Facility type
- 계획 단계 엣지 AI 데이터센터
- Building and facility size
- 센터: 사용 층·구역 미공 items
- Public Power
- 계획: 수전 9.8MW · IT 부하·전력계약·통전 미공 items
- Project Phases
- Plan
- Opening and announced dates
- 2027년 상반기(국문)·2027년 4분기(영문) 목표
How to interpret the specifications
2026년 9월 국·영문 소개서의 개소목표가 다릅니다. 계획수전과 실제 공급을 구분하며, 기존 여의도 운영센터의 주소나 전력을 이 계획에 적용하지 않습니다.
Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.
Colocation and lease terms
Loading space availability and lease terms…
Want to know the colocation conditions at this center?
The center name is prefilled in your inquiry. Add your required capacity and timing if known.
You can submit an initial inquiry without signing up.Participants and investment
Loading participants, investments and delivery history…
Development and completion history
Permitting and development history
Plan · Check the scope of each building permit, construction start and use approval record.
Search the permit register →- Operation and opening
- 2027년 상반기(국문)·2027년 4분기(영문) 목표
Power, cooling and building
Loading power, cooling and building specifications…
Sources and review history
SOURCES & UPDATES
Sources and review dates
The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.Public source documents 2records · latest check 2026-11-21
- 01Company Introduction 260911 V4.5 English · development plans ↗
DC KOREA
Source reference date 2026-09-11 · Observed 2026-11-21
- 02
Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.
Suggest a correction or provide information →Loading linked supporting evidence…
Loading additional records…
Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.