DCK 용인 구성 AI R&D 센터 계획 · Plan
Permit, construction and use-approval milestones reflect the scope of each documented record.
Current status
Current facility status and operating features
Plan · 2029년 상반기(국문)·2029년 4분기(영문) 목표
Distinguish total facility capacity from capacity currently available to lease.
- Operation and development
- 디씨코리아(DCK·개발)
- Facility type
- 계획 단계 AI 데이터센터·R&D
- Building and facility size
- 사업자 계획부지 1,300평
- Verify data
- 2026-11-21
Loading project participants…
FACILITY PROFILE
About this data center
Yongin, Gyeonggi Province · 계획 단계 AI 데이터센터·R&DSome original descriptions below are in Korean. Request an English review of this facility →
디씨코리아가 용인 구성권에서 추진하는 AI R&D 센터 개발계획입니다.
- 01계획 수전 20MW·IT 14MW
- 02구성권 개발계획
LOCATION & ACCESS
Location and surrounding area
행정구역 확인 · 공개된 사업권역입니다. 개별 필지·건물과 정확한 시설 위치는 아직 확인되지 않았습니다.
The map shows the area center. The facility address and site boundary are not confirmed.
FACILITIES & SERVICES
Facilities and operating features
Based on public information for this facility.- Operating and Development Entities
- 디씨코리아(DCK·개발)
- Facility type
- 계획 단계 AI 데이터센터·R&D
- Building and facility size
- 사업자 계획부지 1,300평
- Public Power
- 계획 수전 20MW · 계획 IT 부하 14MW · 공급계약·통전 미확인
- Project Phases
- Plan
- Opening and announced dates
- 2029년 상반기(국문)·2029년 4분기(영문) 목표
How to interpret the specifications
공식 프로젝트 안내와 회사소개서의 수전계획을 대조했습니다. 국·영문 개소목표가 달라 확정일로 표시하지 않습니다.
Utility power, UPS capacity and IT load are separate measures. Total facility capacity is also distinct from capacity currently available for occupancy.
Colocation and lease terms
Loading space availability and lease terms…
Want to know the colocation conditions at this center?
The center name is prefilled in your inquiry. Add your required capacity and timing if known.
You can submit an initial inquiry without signing up.Participants and investment
Loading participants, investments and delivery history…
Development and completion history
Permitting and development history
Plan · Check the scope of each building permit, construction start and use approval record.
Search the permit register →- Operation and opening
- 2029년 상반기(국문)·2029년 4분기(영문) 목표
Power, cooling and building
Loading power, cooling and building specifications…
Sources and review history
SOURCES & UPDATES
Sources and review dates
The source date is the date stated in the document; the review date is when it was checked. These differ from facility completion and operation start dates.Public source documents 3records · latest check 2026-11-21
- 01Company Introduction 260911 V4.5 English · development plans ↗
DC KOREA
Source reference date 2026-09-11 · Observed 2026-11-21
- 02
- 03
Power, area, cooling and certification information is limited to what has been published. Available capacity, pricing and contract terms require confirmation with the operator.
Suggest a correction or provide information →Loading linked supporting evidence…
Loading additional records…
Review source reference dates and review dates together. Facility specifications and operation information have a different scope from current supply terms.