180/181 Clynelish Muir BESS
接続登録 · scoping
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| MW Connected | 0 MW | 原出典の列定義 · project stage · Scoping 基準日 2026-10-01 根拠 EV-20b891c892d345b9cbafa3d2 |
| MW Increase / Decrease | 50 MW | 原出典の列定義 · project stage · Scoping 基準日 2026-10-01 根拠 EV-20b891c892d345b9cbafa3d2 |
| Cumulative Total Capacity (MW) | 50 MW | 原出典の列定義 · project stage · Scoping 基準日 2026-10-01 根拠 EV-20b891c892d345b9cbafa3d2 |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Project Name | 180/181 Clynelish Muir BESS |
| Customer Name | Opdenergy UK 19 Limited |
| Connection Site | BRORA 132/33KV GRID SUPPLY POINT SUBSTATION |
| Stage | 未取得 |
| MW Connected | 0.00 |
| MW Increase / Decrease | 50.00 |
| Cumulative Total Capacity (MW) | 50.00 |
| MW Effective From | 2030-10-31 |
| Project Status | Scoping |
| HOST TO | SHET |
| Plant Type | Energy Storage System |
| Project ID | a0l8e0000011zr5AAA |
| Project Number | PRO-003597 |
| Gate | 1 |
| 原文の状態 | Scoping |
| source_record_id | csv:row:2 |
位置: 座標未取得・地図表示なし
原文・基準日・確認日 1件
資料の基準 2026-10-01 ・取得確認 2026-10-05
Supported by National Energy SO Open Data
原文内の位置 csv:row:2
根拠 EV-20b891c892d345b9cbafa3d2資料SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 65d0c18b4389db4d7b59b4b12d77fcd42f91d3741a3f5781d1f241d22cf5f79d