POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Bramley BESS

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:156fd295772c723dd875a3af · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:f4bfd8bbae7e21d4e75740b4
to_kindpower_object
to_idneso:connection_site:156fd295772c723dd875a3af
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:261

Sources EV-3077fcf2a1a7155dbf3c45d1
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 c4d721a8ba8a0a923ecaf776b8191ebecfef69c02ce746048729205339d8ab6f

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Bramley BESS

Connection register · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-3077fcf2a1a7155dbf3c45d1
MW Increase / Decrease7.01 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-3077fcf2a1a7155dbf3c45d1
Cumulative Total Capacity (MW)57 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-3077fcf2a1a7155dbf3c45d1
Detailed source fields
Original source fieldPublished value or condition
Project NameBramley BESS
Customer NameBRAMLEY BESS LIMITED
Connection SiteBramley 400kV Substation
Stage2.00
MW Connected0.00
MW Increase / Decrease7.01
Cumulative Total Capacity (MW)57.00
MW Effective From2037-10-31
Project StatusUnder Construction/Commissioning
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l4L0000005igrQAA
Project NumberPRO-001104-2
Gate2
Original textUnder Construction/Commissioning
source_record_idcsv:row:261

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:261

Sources EV-3077fcf2a1a7155dbf3c45d1
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 c4d721a8ba8a0a923ecaf776b8191ebecfef69c02ce746048729205339d8ab6f

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Bramley BESS

project stage · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBramley BESS
Customer NameBRAMLEY BESS LIMITED
Connection SiteBramley 400kV Substation
Stage2.00
MW Connected0.00
MW Increase / Decrease7.01
Cumulative Total Capacity (MW)57.00
MW Effective From2037-10-31
Project StatusUnder Construction/Commissioning
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l4L0000005igrQAA
Project NumberPRO-001104-2
Gate2
Original textUnder Construction/Commissioning
source_record_idcsv:row:261

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:261

Sources EV-3077fcf2a1a7155dbf3c45d1
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480