POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Dogger Bank D Offshore Wind Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:3b410d07fe2d6d7fd29463ab · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:cd3f2740ae1df2dd96be8ecc
to_kindpower_object
to_idneso:connection_site:3b410d07fe2d6d7fd29463ab
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:588

Sources EV-f2cbf54011f01000e1f875fe
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 652a8a71ec25e4726bfaf8ecd89c777f32e41791315c2fc35f6d13c965821dff

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Dogger Bank D Offshore Wind Farm

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-f2cbf54011f01000e1f875fe
MW Increase / Decrease1450 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-f2cbf54011f01000e1f875fe
Cumulative Total Capacity (MW)1450 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-f2cbf54011f01000e1f875fe
Detailed source fields
Original source fieldPublished value or condition
Project NameDogger Bank D Offshore Wind Farm
Customer NameDoggerbank Offshore Wind Farm Project 4 Projco Limited
Connection SiteBirkhill Wood 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease1450.00
Cumulative Total Capacity (MW)1450.00
MW Effective From2031-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeWind Offshore
Project IDa0l4L0000005idWQAQ
Project NumberPRO-001675
GateNot obtained
Original textScoping
source_record_idcsv:row:588

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:588

Sources EV-f2cbf54011f01000e1f875fe
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 652a8a71ec25e4726bfaf8ecd89c777f32e41791315c2fc35f6d13c965821dff

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Dogger Bank D Offshore Wind Farm

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameDogger Bank D Offshore Wind Farm
Customer NameDoggerbank Offshore Wind Farm Project 4 Projco Limited
Connection SiteBirkhill Wood 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease1450.00
Cumulative Total Capacity (MW)1450.00
MW Effective From2031-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeWind Offshore
Project IDa0l4L0000005idWQAQ
Project NumberPRO-001675
GateNot obtained
Original textScoping
source_record_idcsv:row:588

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:588

Sources EV-f2cbf54011f01000e1f875fe
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 652a8a71ec25e4726bfaf8ecd89c777f32e41791315c2fc35f6d13c965821dff

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel