This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Kilmarnock BESS

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:f47860ebaf1f132b282a4fb4 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:6e7ec924eab4108299e25b97
to_kindpower_object
to_idneso:connection_site:f47860ebaf1f132b282a4fb4
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1139

Sources EV-6fec01a7acacc349004ad623
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 7661e52f2c28d7945ee63c310ec982a8526417e1db3d1b888fb90a7d4ccddbd6

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Kilmarnock BESS

Connection register · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-6fec01a7acacc349004ad623
MW Increase / Decrease350 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-6fec01a7acacc349004ad623
Cumulative Total Capacity (MW)350 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-6fec01a7acacc349004ad623
Detailed source fields
Original source fieldPublished value or condition
Project NameKilmarnock BESS
Customer NameKilmarnock Flexpower Ltd
Connection SiteBoydston 400kV substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease350.00
Cumulative Total Capacity (MW)350.00
MW Effective From2026-11-30
Project StatusUnder Construction/Commissioning
Agreement TypeDirect Connection
HOST TOSPT
Plant TypeEnergy Storage System
Project IDa0l4L0000005iwSQAQ
Project NumberPRO-001836
Gate2
Original textUnder Construction/Commissioning
source_record_idcsv:row:1139

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1139

Sources EV-6fec01a7acacc349004ad623
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 7661e52f2c28d7945ee63c310ec982a8526417e1db3d1b888fb90a7d4ccddbd6

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Kilmarnock BESS

project stage · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameKilmarnock BESS
Customer NameKilmarnock Flexpower Ltd
Connection SiteBoydston 400kV substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease350.00
Cumulative Total Capacity (MW)350.00
MW Effective From2026-11-30
Project StatusUnder Construction/Commissioning
Agreement TypeDirect Connection
HOST TOSPT
Plant TypeEnergy Storage System
Project IDa0l4L0000005iwSQAQ
Project NumberPRO-001836
Gate2
Original textUnder Construction/Commissioning
source_record_idcsv:row:1139

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1139

Sources EV-6fec01a7acacc349004ad623
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 7661e52f2c28d7945ee63c310ec982a8526417e1db3d1b888fb90a7d4ccddbd6

Usage terms NESO Open Data Licence