POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Afan Wind Farm and BESS

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:812ebe26b0a5d7327a6e3e7c · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:1d0e2232e065d86f907a1b25
to_kindpower_object
to_idneso:connection_site:812ebe26b0a5d7327a6e3e7c
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:22

Sources EV-8403595e67bcb6b89ba3599d
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 6f0e1db91bc8227ea4f454cdda5c4f7455d552d1c7fa994fd4aafd24f85e4972

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Afan Wind Farm and BESS

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-8403595e67bcb6b89ba3599d
MW Increase / Decrease150 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-8403595e67bcb6b89ba3599d
Cumulative Total Capacity (MW)150 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-8403595e67bcb6b89ba3599d
Detailed source fields
Original source fieldPublished value or condition
Project NameAfan Wind Farm and BESS
Customer NameTRYDAN GWYRDD CYMRU (Welsh Government) Ltd
Connection SiteSOUTH WALES WEST CONNECTION NODE A 132KV SUBSTATION
StageNot obtained
MW Connected0.00
MW Increase / Decrease150.00
Cumulative Total Capacity (MW)150.00
MW Effective From2036-12-06
Project StatusScoping
Agreement TypeEmbedded
HOST TONGET
Plant TypeEnergy Storage System;Wind Onshore
Project IDa0l8e0000012i2aAAA
Project NumberPRO-004588
GateNot obtained
Original textScoping
source_record_idcsv:row:22

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:22

Sources EV-8403595e67bcb6b89ba3599d
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 6f0e1db91bc8227ea4f454cdda5c4f7455d552d1c7fa994fd4aafd24f85e4972

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Afan Wind Farm and BESS

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameAfan Wind Farm and BESS
Customer NameTRYDAN GWYRDD CYMRU (Welsh Government) Ltd
Connection SiteSOUTH WALES WEST CONNECTION NODE A 132KV SUBSTATION
StageNot obtained
MW Connected0.00
MW Increase / Decrease150.00
Cumulative Total Capacity (MW)150.00
MW Effective From2036-12-06
Project StatusScoping
Agreement TypeEmbedded
HOST TONGET
Plant TypeEnergy Storage System;Wind Onshore
Project IDa0l8e0000012i2aAAA
Project NumberPRO-004588
GateNot obtained
Original textScoping
source_record_idcsv:row:22

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:22

Sources EV-8403595e67bcb6b89ba3599d
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 6f0e1db91bc8227ea4f454cdda5c4f7455d552d1c7fa994fd4aafd24f85e4972

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel