POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Coulin Hydro

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:1782fc4c8ebb2436a23eeca7 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:d94d6aa919a50f5f51d184e0
to_kindpower_object
to_idneso:connection_site:1782fc4c8ebb2436a23eeca7
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:151

Sources EV-96e493da0cf9164f6b960b24
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 a7e6d6394e74a5ed7266284071aaf754f8f79a1d4986d42b9f12ebe0f2686eef

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Coulin Hydro

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected1.2 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-96e493da0cf9164f6b960b24
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-96e493da0cf9164f6b960b24
Cumulative Total Capacity (MW)1.2 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-96e493da0cf9164f6b960b24
Detailed source fields
Original source fieldPublished value or condition
Project NameCoulin Hydro
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteGrudie Bridge GSP
StageNot obtained
MW Connected1.20
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)1.20
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeHydro
Project IDa0l4L0000005irZQAQ
Project NumberPRO-000656
GateNot obtained
Original textBuilt
source_record_idcsv:row:151

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:151

Sources EV-96e493da0cf9164f6b960b24
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 a7e6d6394e74a5ed7266284071aaf754f8f79a1d4986d42b9f12ebe0f2686eef

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Coulin Hydro

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameCoulin Hydro
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteGrudie Bridge GSP
StageNot obtained
MW Connected1.20
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)1.20
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeHydro
Project IDa0l4L0000005irZQAQ
Project NumberPRO-000656
GateNot obtained
Original textBuilt
source_record_idcsv:row:151

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:151

Sources EV-96e493da0cf9164f6b960b24
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 a7e6d6394e74a5ed7266284071aaf754f8f79a1d4986d42b9f12ebe0f2686eef

Usage terms NESO Open Data Licence

Start a consultation · Choose a channel