POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Moor House Wind Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:49a4a5457ed82bc8f39d0f1e · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:7bb207b18b3146f3e21869d7
to_kindpower_object
to_idneso:connection_site:49a4a5457ed82bc8f39d0f1e
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:394

Sources EV-1b1de7ef22e6f8574564f492
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 52f90af094335aff8eebec341f21c0bcba762f58d0bfef20f1b65266c8b5351a

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Moor House Wind Farm

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected0.5 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-1b1de7ef22e6f8574564f492
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-1b1de7ef22e6f8574564f492
Cumulative Total Capacity (MW)0.5 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-1b1de7ef22e6f8574564f492
Detailed source fields
Original source fieldPublished value or condition
Project NameMoor House Wind Farm
Customer NameSP DISTRIBUTION PLC
Connection SiteBerwick 132/33kV
StageNot obtained
MW Connected0.50
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)0.50
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSPT
Plant TypeWind Onshore
Project IDa0l4L0000005iMeQAI
Project NumberPRO-000843
GateNot obtained
Original textBuilt
source_record_idcsv:row:394

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:394

Sources EV-1b1de7ef22e6f8574564f492
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 52f90af094335aff8eebec341f21c0bcba762f58d0bfef20f1b65266c8b5351a

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Moor House Wind Farm

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameMoor House Wind Farm
Customer NameSP DISTRIBUTION PLC
Connection SiteBerwick 132/33kV
StageNot obtained
MW Connected0.50
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)0.50
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSPT
Plant TypeWind Onshore
Project IDa0l4L0000005iMeQAI
Project NumberPRO-000843
GateNot obtained
Original textBuilt
source_record_idcsv:row:394

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:394

Sources EV-1b1de7ef22e6f8574564f492
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 52f90af094335aff8eebec341f21c0bcba762f58d0bfef20f1b65266c8b5351a

Usage terms NESO Open Data Licence

Start a consultation · Choose a channel