POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Auchnasavil Battery Storage

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:e6ed3122d528d6d434bedb56 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:109e7411c15d85f6a9d05456
to_kindpower_object
to_idneso:connection_site:e6ed3122d528d6d434bedb56
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:27

Sources EV-c851f206fba7c86d754c07cb
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 2c1ac066feb530ce5ac524121a07ba89b3c274bfd12afdf1aa5749f022c8f3ac

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Auchnasavil Battery Storage

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-c851f206fba7c86d754c07cb
MW Increase / Decrease49.9 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-c851f206fba7c86d754c07cb
Cumulative Total Capacity (MW)49.9 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-c851f206fba7c86d754c07cb
Detailed source fields
Original source fieldPublished value or condition
Project NameAuchnasavil Battery Storage
Customer NameAuchnasavil Battery Storage Ltd
Connection SiteCarradale 132/33kV GSP Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease49.90
Cumulative Total Capacity (MW)49.90
MW Effective From2032-10-31
Project StatusAwaiting Consents
HOST TOSHET
Plant TypeEnergy Storage System
Project IDa0l4L0000005iWmQAI
Project NumberPRO-002127
Gate1
Original textAwaiting Consents
source_record_idcsv:row:27

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:27

Sources EV-c851f206fba7c86d754c07cb
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 2c1ac066feb530ce5ac524121a07ba89b3c274bfd12afdf1aa5749f022c8f3ac

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Auchnasavil Battery Storage

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameAuchnasavil Battery Storage
Customer NameAuchnasavil Battery Storage Ltd
Connection SiteCarradale 132/33kV GSP Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease49.90
Cumulative Total Capacity (MW)49.90
MW Effective From2032-10-31
Project StatusAwaiting Consents
HOST TOSHET
Plant TypeEnergy Storage System
Project IDa0l4L0000005iWmQAI
Project NumberPRO-002127
Gate1
Original textAwaiting Consents
source_record_idcsv:row:27

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:27

Sources EV-c851f206fba7c86d754c07cb
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 2c1ac066feb530ce5ac524121a07ba89b3c274bfd12afdf1aa5749f022c8f3ac

Usage terms NESO Open Data Licence

Start a consultation · Choose a channel