POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m 99 Islands / 6 Generator · Retired
Metric or condition Source value Basis, scope and stage Nameplate Capacity (MW) 3 MW Original source column definition · Generator · Retired As-of date 2026-08 Sources EV-db48e24e34ad9c30d4ca4a38 Net Summer Capacity (MW) 2.4 MW Original source column definition · Generator · Retired As-of date 2026-08 Sources EV-db48e24e34ad9c30d4ca4a38 Net Winter Capacity (MW) 2.4 MW Original source column definition · Generator · Retired As-of date 2026-08 Sources EV-db48e24e34ad9c30d4ca4a38
Detailed source fields Original source field Published value or condition Entity ID 5416 Entity Name Duke Energy Carolinas, LLC Plant ID 3272 Plant Name 99 Islands Google Map Map Bing Map Map Plant State SC County Cherokee Balancing Authority Code DUK Sector Electric Utility Generator ID 6 Nameplate Capacity (MW) 3 Net Summer Capacity (MW) 2.4 Net Winter Capacity (MW) 2.4 Technology Conventional Hydroelectric Energy Source Code WAT Prime Mover Code HY Operating Month 5 Operating Year 1910 Retirement Month 12 Retirement Year 2018 Latitude 35.0314 Longitude -81.4936 Original text Retired Coordinate accuracy source_precision_not_independently_surveyed source_record_id Retired:2324
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2049
Sources EV-d7ba586de297b33a04628171 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 a4f42066d539ee71645a397443f5357640b4ba4f8c5925466821e98173a5b775 Usage terms US government public domain
eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Retired:2324
Sources EV-db48e24e34ad9c30d4ca4a38 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 baf853c6a28870304aac18ece31a46f485811b2e33fe78852c11cf91370bfa4f Usage terms US government public domain
Observations for this power asset View on the global map Source snapshots by date · USA · eia860m 99 Islands / 6 Generator · Retired
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Entity ID 5416 Entity Name Duke Energy Carolinas, LLC Plant ID 3272 Plant Name 99 Islands Google Map Map Bing Map Map Plant State SC County Cherokee Balancing Authority Code DUK Sector Electric Utility Generator ID 6 Nameplate Capacity (MW) 3 Net Summer Capacity (MW) 2.4 Net Winter Capacity (MW) 2.4 Technology Conventional Hydroelectric Energy Source Code WAT Prime Mover Code HY Operating Month 5 Operating Year 1910 Retirement Month 12 Retirement Year 2018 Latitude 35.0314 Longitude -81.4936 Original text Retired source_record_id Retired:2324
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860m ↗ Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Retired:2324
Sources EV-db48e24e34ad9c30d4ca4a38 Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c 행 SHA-256 baf853c6a28870304aac18ece31a46f485811b2e33fe78852c11cf91370bfa4f Usage terms US government public domain
Observations for this power asset Source snapshots by date · USA · eia860 99 Islands / 6 Generator · Retired
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Utility ID 5416 Utility Name Duke Energy Carolinas, LLC Plant Code 3272 Plant Name 99 Islands State SC County Cherokee Generator ID 6 Technology Conventional Hydroelectric Prime Mover HY Ownership S Duct Burners X Can Bypass Heat Recovery Steam Generator? X Nameplate Capacity (MW) 3 Nameplate Power Factor 1 Summer Capacity (MW) 2.4 Winter Capacity (MW) 2.4 Minimum Load (MW) 1.6 Uprate or Derate Completed During Year N Status RE Synchronized to Transmission Grid X Operating Month 5 Operating Year 1910 Retirement Month 12 Retirement Year 2018 Associated with Combined Heat and Power System N Sector Name Electric Utility Sector 1 Topping or Bottoming X Energy Source 1 WAT Solid Fuel Gasification System? N Carbon Capture Technology? N Turbines or Hydrokinetic Buoys 0 Time from Cold Shutdown to Full Load 10M Original text RE source_record_id 3_1_Generator_Y2025.xlsx#Retired and Canceled:2049
Parent facility or plant record
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items eia860 ↗ Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2049
Sources EV-d7ba586de297b33a04628171 Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba 행 SHA-256 a4f42066d539ee71645a397443f5357640b4ba4f8c5925466821e98173a5b775 Usage terms US government public domain
Observations for this power asset