POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 53items · current page 1–53 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage Unit Capacity (MW DC) 2.4 MWdc Original source column definition · Generation-register unit · Committed As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a Unit Capacity (MW AC) 2.4 MWac Original source column definition · Generation-register unit · Committed As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a Aggregated Nameplate Capacity (MW DC) 240 MWdc Original source column definition · Generation-register unit · Committed As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a Aggregated Nameplate Capacity (MW AC) 240 MWac Original source column definition · Generation-register unit · Committed As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a Agg Nameplate Storage Capacity (MWh) 360 MWh Original source column definition · Generation-register unit · Committed As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a
Detailed source fields Original source field Published value or condition Survey ID 2891 Site Name Broadsound_BESS Site Owner Broadsound Solar Farm Pty Ltd Region QLD1 Max Site Capacity (AC) 180 Gen Info Unit ID 289101 Unit Name BROADSOUND BESS Technology Type Battery Storage Technology Detail Lithium-ion DUID BRDDBES1 Dispatch Type Scheduled Unit Count 100 Unit Capacity (MW DC) 2.4 Unit Capacity (MW AC) 2.4 Aggregated Nameplate Capacity (MW DC) 240 Aggregated Nameplate Capacity (MW AC) 240 Agg Nameplate Storage Capacity (MWh) 360 Commitment Status Committed Full Commercial Use Date 2026-07-20T00:00:00 Expected Closure Year 2056 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-05-19T09:41:58 record_semantics participant_reported_generation_information_not_DC_supply Original text Committed source_record_id Generator Information:196
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:88
Sources EV-b338ca33b99b096a87af69cb Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 2b40f87640ad19b9168562e2259bcd2df35237d142a2c9eeb329272ce1715155 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 2891 Site Name Broadsound_BESS Site Owner Broadsound Solar Farm Pty Ltd Region QLD1 Max Site Capacity (AC) 180 Gen Info Unit ID 289101 Unit Name BROADSOUND BESS Technology Type Battery Storage Technology Detail Lithium-ion DUID BRDDBES1 Dispatch Type Scheduled Unit Count 100 Unit Capacity (MW DC) 2.4 Unit Capacity (MW AC) 2.4 Aggregated Nameplate Capacity (MW DC) 240 Aggregated Nameplate Capacity (MW AC) 240 Agg Nameplate Storage Capacity (MWh) 360 Commitment Status Committed Full Commercial Use Date 2026-07-20T00:00:00 Expected Closure Year 2056 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-05-19T09:41:58 record_semantics participant_reported_generation_information_not_DC_supply Original text Committed source_record_id Generator Information:196
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region QLD1 AEMO Survey ID 2891 Gen Info Unit ID 289101 Site Name Broadsound_BESS DUID BRDDBES1 Commitment Status Committed Expected Closure Year 2056 Survey Latest Update Date 2026-05-19T09:41:58 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text Committed source_record_id Expected Closure Year:88
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:88
Sources EV-b338ca33b99b096a87af69cb Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 2b40f87640ad19b9168562e2259bcd2df35237d142a2c9eeb329272ce1715155 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 360 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 360 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 360 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 360 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 360 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 360 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 360 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 360 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 360 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 360 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 360 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 360 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 360 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 360 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 360 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 360 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 360 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 360 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 360 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Storage Capacity 360 MWh Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 180 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-e9774c774245c6bcf6953c3a 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:196
Sources EV-e9774c774245c6bcf6953c3a Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 1ecfc5cf16f6d54b7c82de63eabaf0743431e85f505e8f2b0178dd5c9c8adb4e Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset