Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 33items · current page 1–33 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage Unit Capacity (MW AC) 5.82 MWac Original source column definition · Generation-register unit · Committed As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f Aggregated Nameplate Capacity (MW AC) 221.16 MWac Original source column definition · Generation-register unit · Committed As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f
Detailed source fields Original source field Published value or condition Survey ID 2003 Site Name Boulder Creek Wind Farm KCI Id Q00013 Site Owner Boulder Creek Wind Farm Pty Ltd as trustee for BCWF Unit Trust and BCWF 2 Pty Limited Region QLD1 Max Site Capacity (AC) 228 Gen Info Unit ID 200302 Unit Name BCWF_GU1 Technology Type Wind Technology Detail Onshore Dispatch Type Semi-scheduled Unit Count 38 Unit Capacity (MW AC) 5.82 Aggregated Nameplate Capacity (MW AC) 221.16 Commitment Status Committed Full Commercial Use Date 2027-12-31T00:00:00 Expected Closure Year 2067 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-05-12T11:02:50 record_semantics participant_reported_generation_information_not_DC_supply Original text Committed source_record_id Generator Information:169
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:76
Sources EV-12e5ead4050b827ce07390fa Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 23ba162e1687fdcb2d76f7192a9e69d2a99086ebc217997134d7305fd4f9e1c2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region QLD1 AEMO Survey ID 2003 Gen Info Unit ID 200302 Site Name Boulder Creek Wind Farm Commitment Status Committed Expected Closure Year 2067 Survey Latest Update Date 2026-05-12T11:02:50 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text Committed source_record_id Expected Closure Year:76
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:76
Sources EV-12e5ead4050b827ce07390fa Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 23ba162e1687fdcb2d76f7192a9e69d2a99086ebc217997134d7305fd4f9e1c2 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 2003 Site Name Boulder Creek Wind Farm KCI Id Q00013 Site Owner Boulder Creek Wind Farm Pty Ltd as trustee for BCWF Unit Trust and BCWF 2 Pty Limited Region QLD1 Max Site Capacity (AC) 228 Gen Info Unit ID 200302 Unit Name BCWF_GU1 Technology Type Wind Technology Detail Onshore Dispatch Type Semi-scheduled Unit Count 38 Unit Capacity (MW AC) 5.82 Aggregated Nameplate Capacity (MW AC) 221.16 Commitment Status Committed Full Commercial Use Date 2027-12-31T00:00:00 Expected Closure Year 2067 Survey Last Requested Date 2026-12-05T00:00:00 Survey Latest Update Date 2026-05-12T11:02:50 record_semantics participant_reported_generation_information_not_DC_supply Original text Committed source_record_id Generator Information:169
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 221.008 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 221.008 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106.21 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 221.008 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 221.008 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 221.008 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106.21 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106.21 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 221.008 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106.21 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 221.008 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 221.008 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106.21 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 221.008 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 221.008 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 221.008 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 221.008 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 221.008 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 0 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106.21 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106.21 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 221.008 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 221.008 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 221.008 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106.21 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 221.008 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 106.21 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-2982700fde69c023436e920f 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:169
Sources EV-2982700fde69c023436e920f Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 4dcd2d012c3e637da41c2df27a0a7eb77fd64a408f3ec5e813efa0720f89ff31 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset