POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 33items · current page 1–33 · Source records, not unique facilities.
Power assets and projects · AUS · aemo_generation Braemar Generator · Operations
Metric or condition Source value Basis, scope and stage Unit Capacity (MW AC) 188 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba Aggregated Nameplate Capacity (MW AC) 188 MWac Original source column definition · Generation-register unit · In Service As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba
Detailed source fields Original source field Published value or condition Survey ID 1026 Site Name Braemar Site Owner Braemar Power Project Pty Ltd Region QLD1 Max Site Capacity (AC) 564 Gen Info Unit ID 102601 Unit Name Braemar:BRAEMAR1 Technology Type Gas Turbine Technology Detail OCGT Gas Turbine Fuel Type Natural Gas DUID BRAEMAR1 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 188 Aggregated Nameplate Capacity (MW AC) 188 Commitment Status In Service Expected Closure Year 2046 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-03-12T16:21:21 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:179
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:78
Sources EV-47c141e0a480d98168ef7b06 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 3fac0c36024ed558b6cf7dc0602e6b7fa239bb21b120898d6cef829c235a3cde Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Region QLD1 AEMO Survey ID 1026 Gen Info Unit ID 102601 Site Name Braemar DUID BRAEMAR1 Commitment Status In Service Expected Closure Year 2046 Survey Latest Update Date 2026-03-12T16:21:21 Publication Date 2024-07-24T00:00:00 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Expected Closure Year:78
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_closure ↗ Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:78
Sources EV-47c141e0a480d98168ef7b06 Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8 행 SHA-256 3fac0c36024ed558b6cf7dc0602e6b7fa239bb21b120898d6cef829c235a3cde Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition Survey ID 1026 Site Name Braemar Site Owner Braemar Power Project Pty Ltd Region QLD1 Max Site Capacity (AC) 564 Gen Info Unit ID 102601 Unit Name Braemar:BRAEMAR1 Technology Type Gas Turbine Technology Detail OCGT Gas Turbine Fuel Type Natural Gas DUID BRAEMAR1 Dispatch Type Scheduled Unit Count 1 Unit Capacity (MW AC) 188 Aggregated Nameplate Capacity (MW AC) 188 Commitment Status In Service Expected Closure Year 2046 Survey Last Requested Date 2026-03-10T00:00:00 Survey Latest Update Date 2026-03-12T16:21:21 record_semantics participant_reported_generation_information_not_DC_supply Original text In Service source_record_id Generator Information:179
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 167 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Summer Peak 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 167 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Summer Peak 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 173 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Summer Typical 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 181 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Winter 2027
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 167 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Summer Peak 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 173 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Summer Typical 2029-30
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 181 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Winter 2026
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 173 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Summer Typical 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 173 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Summer Typical 2030-31
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 173 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Summer Typical 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 181 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Winter 2030
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 173 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Summer Typical 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 173 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Summer Typical 2033-34
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 181 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Winter 2031
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 167 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Summer Peak 2031-32
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 167 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Summer Peak 2027-28
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 167 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Summer Peak 2026-27
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 167 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Summer Peak 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 167 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Summer Peak 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 173 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Summer Typical 2035-36
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 173 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Summer Typical 2028-29
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 181 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Winter 2035
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 167 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Summer Peak 2034-35
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 181 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Winter 2033
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 167 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Summer Peak 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 181 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Winter 2032
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 173 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Summer Typical 2032-33
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 181 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Winter 2028
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 181 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Winter 2034
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset Metric or condition Source value Basis, scope and stage Scheduled Capacity 181 MW Not obtained · Generation-register unit · Forecast As-of date 2026-07-31 Sources EV-6bab77342098d67ac1866dba 측정·전망기간 Winter 2029
Seasonal generation-capacity forecast; not metered data-center demand.
Sources, reference dates and retrieval dates 1items aemo_generation ↗ Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:179
Sources EV-6bab77342098d67ac1866dba Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d 행 SHA-256 2e3686f449dde20157341013de9b0c989afad994e98324c1611f48a1f8ac9f05 Usage terms AEMO general copyright permission subject to exceptions
Observations for this power asset